LCL Diegem

Latest Podcast Kouterveldstraat 13
Operational
Fully operational facility
Operated by:

LCL Diegem

░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power

Map and Nearby Locations

Kouterveldstraat 13
LCL Belgium n.v. Sites
Nearby Facilities

Sites within 15 miles of LCL Diegem

Distance Site About
0.01 miles LCL: Diegem
LCL Data Centers has launched a new data center at its Brussels-North campus in Diegem, marking the expansion of its largest facility and strengthening its position as a domestic provider of sovereign digital infrastructure in Belgium.
0.25 miles Verizon Brussels H and E
0.41 miles DC United: Brussels
Datacenter United's Brussels facility is a 1,200 sqm, two-story building in Zaventem, northeast of Brussels.
1.45 miles Digital Realty: Brussels BRU1
BRU1 was previously operated by Interxion
2.20 miles DC United: Machelen II
In 2024, Belgian telco Proximus sold its data centers to local operator Datacenter United (DC United). This data center was part of the acquisition.
2.25 miles Digital Realty: BRU4
BRU4 was previously operated by Interxion
2.32 miles Digital Realty: BRU3
2.37 miles AtlasEdge DC Brussels 1&2
2.60 miles KevlinX: Brussels BRU01
European data center firm KevlinX has broken ground on its debut facility in Brussels, Belgium. The 25,400 sqm campus will be built in two phases.
2.72 miles DC United: Evere
In 2024, Belgian telco Proximus sold its data centers to local operator Datacenter United (DC United). This data center was part of the acquisition.
2.78 miles Lumen Brussels
5.35 miles Ark: Brussels Campus
Ark Data Centres is expanding into Europe with a new two-building data center campus in Brussels.
7.26 miles Penta Infra: BRU01
The facility is situated in the Green Energy Park in Zellik and features a nine-story data center spanning 10,000 square meters (107,639 sq ft).
9.02 miles DC United: Machelen
In 2024, Belgian telco Proximus sold its data centers to local operator Datacenter United (DC United). This data center was part of the acquisition.
12.16 miles EdgeConneX: Brussels
EdgeConneX's first Belgian data center campus is located in Ternat, under 15km from Brussels.
18.27 miles LCL Aalst

LCL Diegem Data Center Photos See all

Exterior of LCL's Site in Diegem
Source: Baxtel

Operating Company

Operated by:
5
Facilities
3
Markets

News See all

Read LCL Opens New Data Center in Brussels, Belgium
LCL Opens New Data Center in Brussels, Belgium

LCL Opens New Data Center in Brussels, Belgium

March 27, 2026 LCL Belgium n.v.

LCL Data Centers has opened a new facility in Belgium, unveiling its largest data center yet at the Brussels-North site in Diegem, east of the capital. Laurens van Reijen, founder and CEO of LCL Data Centers, said: “With this new location, we are taking an important next step in building a truly...

Read more
Read Belgian data center operator LCL to invest €120 million in Brussel facilities
Belgian data center operator LCL to invest €120 million in Brussel facilities

Belgian data center operator LCL to invest €120 million in Brussel facilities

October 25, 2023 LCL Belgium n.v.

Belgian data center operator LCL announced its plan to invest €100 million in two expansion projects in Aalst and Diegem – both in the north of the Belgian capital – and €20 million in sustainability efforts. The company has started the expansion work on the Aalst center and plans to add 2,367...

Read more
Read LCL switches diesel for HVO at its Brussels-West data center
LCL switches diesel for HVO at its Brussels-West data center

LCL switches diesel for HVO at its Brussels-West data center

October 31, 2022 Brussels

LCL has announced that it's replacing diesel with hydrotreated vegetable oil (HVO) for its backup generators at its Brussels-West data center in Aalst, after investing in six new 2.25 MVA generators. The company is reportedly the first to do so in Belgium, and it aims to have all the generators...

Read more
Read LCL Data Centers pledges to cut carbon emissions
LCL Data Centers pledges to cut carbon emissions

LCL Data Centers pledges to cut carbon emissions

December 02, 2021 LCL Belgium n.v.

LCL Data Centers has announced that it has joined the Science Based Targets initiative (SBTi). It is now the first Belgium company to do so and signing up means that as a company, it will reduce its carbon emissions and work towards keeping the average increase in global temperatures below 1.5°C....

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?