Grupo Aire OASIX: Toledo

Latest Podcast Calle Puebla de México
Operational
Fully operational facility
Operated by:

Grupo Aire OASIX: Toledo

Year Built: 2022
░░░ Request Dataset MW
Total Power
░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

The Grupo Aire OASIX Toledo data center, operational since 2022, spans over 800m² and houses more than 54 racks.

Map and Nearby Locations

Calle Puebla de México
Oasix | Grupo Aire Sites
Nearby Facilities

Grupo Aire OASIX: Toledo Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Grupo Aire OASIX: Toledo

Distance Site About
5.06 miles Substrate AI: Talavera de la Reina
Spanish AI firm Substrate AI is investing $102.3 million (€100m) to build a new data center outside Toledo, Spain.
5.46 miles Central HubInterested in this information?Contact us
Meta is building a major new data center campus near Talavera de la Reina, Spain, located about 78 miles (125 km) southwest of Madrid.
9.30 miles EdgeMode: GDC Alberche
The planned Alberche data center is part of EdgeMode's broader strategy to deliver 1.5 GW of IT capacity through multiple green, hyperscale campuses currently under development in Spain.

Operating Company

Operated by:
0
Facilities
0
Markets
0MW
Megawatts

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?