E11: Building India’s Digital Backbone with Sharad Agarwal
Mar 12, 2026 Eric Bell World
Go to PodcastGDC Alberche is a small, colocation-focused green data center that Blackberry AIF listed in December 2024 among the smaller projects of its IberData Hub portfolio, planned with grid power and solar self-consumption. Blackberry AIF never published a site, plot or permit for it. The project was not among the sites EdgeMode took into its joint venture with Blackberry AIF, and Blackberry AIF has since said it develops data centers of at least 50 MW.
| Distance | Site | About |
|---|---|---|
| 2.98 miles | Cloud ParkInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 3.46 miles | Substrate AI: Talavera de la Reina |
Substrate AI plans a data center for AI model training on land it bought in the Torrehierro industrial estate in Talavera de la Reina, Toledo.
|
| 5.58 miles | Grupo Aire OASIX: Toledo |
The Grupo Aire OASIX Toledo data center, operational since 2022, spans over 800m² and houses more than 54 racks.
|
Blackberry AIF (BAIF) is a Spanish data center developer based in Seville and led by José Antonio Mora. It develops large AI campuses on leased rural land through one project company per site, under its IberData Hub platform, and plans on-site power from solar, batteries and natural-gas fuel cells. Its projects include sites in Mora (Toledo), Córdoba, Vianos (Albacete), Torrecampo (Córdoba), Cáceres and Tomelloso (Ciudad Real). In 2026 it formed a holding company, Black Artificial Intelligence SL, for its newer project companies.
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to PodcastTell us what you're looking for. We respond within one business day.