Google: Project Spring

Year Planned: 2029
Lot Size: 827 acres

In February 2026, the Sand Springs City Council approved the rezoning for "Project Spring," a Google-backed data center campus located just eight miles west of downtown Tulsa. Developed by White Rose Partners, the 827-acre project is a key component of Google’s recent $9 billion investment in Oklahoma’s cloud and AI infrastructure.

While the campus may eventually house up to three buildings, the development footprint will occupy less than 10% of the total land area, with 30-40% preserved as green space. Construction is scheduled to begin in 2027 for a 2029 completion.

Financially, Google has committed to paying for all new power infrastructure—including a dedicated substation—to ensure no costs are passed to local ratepayers, and the project is expected to generate millions in annual tax revenue for the city and school district. However, the development remains a point of local friction; a group called the Project Sand Springs Alliance has filed an ongoing lawsuit challenging the transparency of the 2025 land annexation process.

Map and Nearby Locations

This Facility
Google Sites
Nearby Facilities

Google: Project Spring Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Tower Two

Distance Site About
0.32 miles Hyperscale Data Center Request Dataset
This facility is part of Google's "Project Spring" near downtown Tulsa.
0.64 miles Hyperscale Data Center Request Dataset
9.16 miles OneNet OSC
9.22 miles Lumen Tulsa 1
9.32 miles TierPoint Tulsa
Located in the historic Brady district north of downtown, TierPoint’s Tulsa data center is the largest carrier-neutral telecommunications space in the area.
9.57 miles OCOSA 321 S Boston
9.57 miles TulsaConnect DC1
All access to the facility is via TulsaConnect escort Cross-connects for analog phone service (POTS), T-1, DS-3, etc available to every rack at no additional charge SSAE 16 audited facilities
9.74 miles TulsaConnect DC2
SSAE 16 audited facility Biometric access control system at facility entrances DC1 is on a different power grid than DC2
9.75 miles Prescott Realty Group-110 West 7th
11.50 miles Project Clydesdale Expansion
11.56 miles Project Clydesdale
Blue Owl-backed data center developer Beale Infrastructure has broken ground on a new campus outside Tulsa, Oklahoma.
11.60 miles HP Cherokee Data Center (Tulsa)
In 2009, EDS expanded the data center to 404,000 square feet with four data halls that each have 40,000 sqft of floor space.
18.51 miles TulsaConnect DC3
Campus has true dual-substation electrical feeds with automatic switchgear to switch between substations True "A" and "B" UPS configuration via reliable Eaton 9395 and Powerware 9315 systems with fully independent output feeds to customer equipment with no common/shared points of failure
18.54 miles TierPoint Tulsa-State Farm
18.54 miles Compass Tulsa

Cloud Point Data Center Photos See all

A massive 827-acre data center proposed for Sand Springs, Oklahoma
Source: Sand Springs rezoning application

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

233
Facilities
74
Markets

News See all

Read Google Named End User of 8 Million sq ft Data Centre in Columbia, Georgia
Google has been named the sole end user and operator of the 8 million sq ft (743,224 sqm) Columbia County Data Center development in Georgia. The company was confirmed as the customer during an ann...

Google Named End User of 8 Million sq ft Data Centre in Columbia, Georgia

July 24, 2026 Google

Google has been named the sole end user and operator of the 8 million sq ft (743,224 sqm) Columbia County Data Center development in Georgia. The company was confirmed as the customer during an announcement by the county’s Economic Development Authority on 23 July. Located northwest of White Oak...

Read more
Read Power and Cooling Failure Causes Google Cloud Outage in Netherlands
Google Cloud suffered an outage in the Netherlands after a data center experienced a loss of utility power and cooling capacity. The Europe-West4 availability zone was affected for nearly 15 hours,...

Power and Cooling Failure Causes Google Cloud Outage in Netherlands

July 21, 2026 Google

Google Cloud suffered an outage in the Netherlands after a data center experienced a loss of utility power and cooling capacity. The Europe-West4 availability zone was affected for nearly 15 hours, impacting services including Google Cloud VMware Engine, Bare Metal Solution, and Google Cloud...

Read more
Read Google Revealed As Customer Behind 2.7GW Data Center Campus Near Cheyenne, Wyoming
Google has been identified as the company behind the 2.7GW Project Tembo data center campus, formerly known as Project Jade, near Cheyenne, Wyoming. The 716-acre campus in Switchgrass Industrial Pa...

Google Revealed As Customer Behind 2.7GW Data Center Campus Near Cheyenne, Wyoming

July 14, 2026 Google

Google has been identified as the company behind the 2.7GW Project Tembo data center campus, formerly known as Project Jade, near Cheyenne, Wyoming. The 716-acre campus in Switchgrass Industrial Park will include four data halls, along with office, logistics, and network buildings. Construction...

Read more
Read Google Plans $1.5 Billion Expansion of Alabama Data Center Campus
Google will invest an additional $1.5 billion to expand its data center campus in Jackson County through 2027. The site, built on the former Widows Creek coal plant, has been operational since 2019...

Google Plans $1.5 Billion Expansion of Alabama Data Center Campus

June 16, 2026 Google

Google will invest an additional $1.5 billion to expand its data center campus in Jackson County through 2027. The site, built on the former Widows Creek coal plant, has been operational since 2019. According to Baxtel, it currently includes two 135,000 sq ft (12,540 sqm) data center buildings,...

Read more
Read Top Data Center News for 8th-13th of June, 2026
**[OpenAI in Early Talks for 10GW Data Center Lease in Ohio](https://baxtel.com/news/openai-in-early-talks-for-10gw-data-center-lease-in-ohio)**
**OpenAI is in advanced talks to lease a proposed 1...

Top Data Center News for 8th-13th of June, 2026

June 15, 2026 Google

OpenAI in Early Talks for 10GW Data Center Lease in Ohio OpenAI is in advanced talks to lease a proposed 10GW data center in Ohio which could be built in phases starting with an 800MW first stage expected in 2028, with full build-out estimated to cost up to $500 billion. Microsoft Acquires...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?