Firmus: Batam

Latest Podcast Kawasan Industri Terpadu Kabil
Under ConstructionPlanned
Multi-phase construction project
Operated by:

Firmus: Batam

Site planned for 2027 and has expansions through 2028
Utility Provider: PLN Batam
This site is leased from DayOne in the DayOne: Kabil Industrial Tech Park building

Firmus: Batam is an AI factory of up to 360 MW that Firmus Technologies announced with NVIDIA and DayOne in June 2026. It is planned to house up to 170,000 accelerators through 2027 and 2028 inside DayOne's Kabil Industrial Tech Park in Batam, Indonesia.

Map and Nearby Locations

Kawasan Industri Terpadu Kabil ( Batu Besar, Kecamatan Nongsa, Kota Batam )
Firmus Technologies Sites
Nearby Facilities

Firmus: Batam Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Firmus: Batam

Distance Site
0.02 miles DayOne: Kabil Industrial Tech Park
0.66 miles NeutraDC: Batam
0.66 miles Nxera: Batam
1.12 miles Quantum AI Data Center
4.09 miles GDC SDN: Batam BTM1 Campus
4.33 miles Nusantara NDC Moratel Batam
4.37 miles Matrix NAP Info: Batam BM1
4.48 miles Carrier Data CenterInterested in this information?Contact us
5.36 miles Range IDC: Batam AI Factory
5.40 miles Omni DC: Batam
5.54 miles IDC Indonesia Batam
5.57 miles Altiva: Nongsa
5.82 miles Racks Central: Batam Campus
5.84 miles Neuviz: Batam
5.88 miles Golden Digital Gateway Data Center
5.96 miles Government Data CenterInterested in this information?Contact us
5.96 miles BW Digital: Nongsa Digital Park
6.06 miles DayOne: Nongsa Bldg3
6.07 miles DayOne: Nongsa Bldg2
6.12 miles DayOne: Nongsa Bldg1
6.22 miles Princeton PDG BT1 Batam
6.66 miles DCI Indonesia: H5 Campus
7.19 miles neuCentrIX Batam

Operating Company

Operated by:

Firmus - formerly known as Firmus Grid - was founded in 2019, and has been offering immersion-cooled AI systems running OpenStack and Kubernetes-based software from Canonical.

0
Facilities
0
Markets

News See all

Read Firmus Completes Data Center Building in Tasmania
Australian neocloud provider Firmus has reached construction milestones at data center projects in Tasmania and Indonesia. In Tasmania, Firmus has topped out the first of two 42MW data halls at its...

Firmus Completes Data Center Building in Tasmania

October 07, 2026 Firmus Technologies

Australian neocloud provider Firmus has reached construction milestones at data center projects in Tasmania and Indonesia. In Tasmania, Firmus has topped out the first of two 42MW data halls at its Launceston site, with primary cooling pipework also installed. In Indonesia, the first data hall...

Read more
Read Firmus and CDC Scrap 1.6GW Project Southgate With Just 42MW Built
[Firmus Technologies](https://baxtel.com/data-centers/firmus-technologies) and [CDC Data Centres](https://baxtel.com/data-centers/canberra-data-centres-cdc) have scrapped Project Southgate, their p...

Firmus and CDC Scrap 1.6GW Project Southgate With Just 42MW Built

October 06, 2026 Firmus Technologies

Firmus Technologies and CDC Data Centres have scrapped Project Southgate, their plan to build up to 1.6GW of AI factories across Australia, after deploying about 42MW, roughly 2.5 percent of the original target. "Firmus and CDC mutually agreed earlier this year not to proceed with the...

Read more
Read Meta Signs for GPU Capacity at Firmus AI Factories in Southeast Asia
[Meta](https://baxtel.com/data-centers/meta) has signed strategic AI infrastructure agreements with Australian AI factory developer [Firmus Technologies](https://baxtel.com/data-centers/firmus-tech...

Meta Signs for GPU Capacity at Firmus AI Factories in Southeast Asia

September 30, 2026 Firmus Technologies

Meta has signed strategic AI infrastructure agreements with Australian AI factory developer Firmus Technologies for GPU compute capacity at Firmus sites across Southeast Asia, the companies announced Tuesday. The agreements cover contracted capacity plus options to expand, and Capital Brief...

Read more
Read Firmus Proposes Third Data Center In Tasmania
Firmus Technologies has proposed a 52MW data center at the former Mill Park paper mill site in Wesley Vale, Tasmania. The project would include a 3,500 sqm (37,695 sq ft) main building, with a 2,69...

Firmus Proposes Third Data Center In Tasmania

September 03, 2026 Firmus Technologies

Firmus Technologies has proposed a 52MW data center at the former Mill Park paper mill site in Wesley Vale, Tasmania. The project would include a 3,500 sqm (37,695 sq ft) main building, with a 2,690 sqm (28,945 sq ft) data hall. The facility would stand about 8.5 meters tall, rising to 15 meters...

Read more
Read Firmus Plans 288MW Data Campus in Tasmania
Australian AI cloud and data center company Firmus is expanding its presence in Tasmania, with plans for a campus in Bell Bay and a potential second site in Wesley Vale. A development application h...

Firmus Plans 288MW Data Campus in Tasmania

June 20, 2026 Firmus Technologies

Australian AI cloud and data center company Firmus is expanding its presence in Tasmania, with plans for a campus in Bell Bay and a potential second site in Wesley Vale. A development application has been lodged for the Bell Bay project, which the company describes as an “AI factory” to be built...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.