Equinix Miami MI3

Latest Podcast 4680 Conference Way South
Operational
Fully operational facility
Operated by:

Equinix Miami MI3

Short Code: MI3
Year Built: 2012
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Location:


  • Location Orientation – It is located 40 mi/64 km north of Miami
  • Miami Intl Airport (MIA) is 50 mi/80 km
  • Fort Lauderdale-Hollywood Intl Airport (FLL) is 29 miles/47 km
  • Parking – Adjacent Building Parking (no cost)

Power:


  • Electrical Capacity – 4-6 kVA per cabinet
  • UPS Configuration – N+1 Block Redundant
  • Utility Feeders – 2
  • Power Transformers – 2
  • Utility Voltage – 13.2 kV
  • Standby Power – 2 x 2,500 kW diesel engine generators
  • Standby Power Config. – N+1

Security


  • Physical – Man Trap Entry
  • Human – 24x7 site personnel/security
  • Electronic – CCTV and Recorders,
  • Motion Detection, HID with Pin Readers

Building


  • Construction Type – Type IIB - Business
  • occupancy. Fully sprinklered.
  • Building Type – 1-story steel/concrete
  • structure
    Floor Load Capacity –
  • Raised Floor – 1,250 lb concentrated load; 400 psf (19.1 kN/m2) uniform load; 800 lb rolling load
  • Server Cabinet Weight – 1,700 lbs maximum

Significant Building Dates


  • Base Building Constructed – 1977
  • Base Building Retrofitted – 2012

Telco Information

  • NPA/NXX: 305-374
  • CLLI code: MIAMFLELNAA
  • LEC: Bell South
  • LATA: 460

Source: http://www.equinix.com/resources/data-sheets/ibx-tech-specs/mi3/

Map and Nearby Locations

4680 Conference Way South
Equinix Sites
Nearby Facilities

Equinix Miami MI3 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Equinix Miami MI3

Distance Site About
0.34 miles Cogent: Conference Way North
1.56 miles 365 Boca Raton
Site was a former Host.net and was acquired by 365 Data Centers in 2017.
6.92 miles Volico Broward
14.65 miles Flexential Fort Lauderdale
Flexential's Miami Fort Lauderdale site is a former Peak 10 site. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017. The rebranding from Peak10 to Flexential was announced in January 2018.
14.93 miles 365: Fort Lauderdale
17.89 miles T-Mobile Everglades MSO

Equinix Miami MI3 Data Center Photos See all

Equinix cage door
Source: Baxtel

Operating Company

Operated by:

Equinix connects the world’s leading businesses to their customers, employees and partners inside the most interconnected data centers.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Equinix Opens 8MW SG6 Data Center As Singapore's First Under Green Rules
[Equinix](https://baxtel.com/data-centers/equinix) opened SG6, its sixth data center in [Singapore](https://baxtel.com/regions/singapore), on Nov. 6 with 8MW of capacity in its first phase, the com...

Equinix Opens 8MW SG6 Data Center As Singapore's First Under Green Rules

November 09, 2026 Equinix

Equinix opened SG6, its sixth data center in Singapore, on Nov. 6 with 8MW of capacity in its first phase, the company announced. Equinix invested about $290 million in the nine-story building at Jalan Tukang in western Singapore. SG6 is the first data center in Singapore built under the...

Read more
Read Schneider Electric and Equinix Trial Software-Defined Switchgear for Data Centers
Equinix and Schneider Electric have partnered to pilot software-defined medium-voltage switchgear at an undisclosed Equinix data center. The technology, developed by Schneider Electric, is designed...

Schneider Electric and Equinix Trial Software-Defined Switchgear for Data Centers

September 30, 2026 Equinix

Equinix and Schneider Electric have partnered to pilot software-defined medium-voltage switchgear at an undisclosed Equinix data center. The technology, developed by Schneider Electric, is designed to reduce the need for specialized cabling and hardware in data centers. Schneider said the...

Read more
Read Diraq And Equinix To Deploy Australia’s First Commercial Quantum Computer
Australian quantum startup Diraq has partnered with Equinix to deploy a quantum computer at an Equinix data center in Sydney. The eight-qubit system will use a silicon chip with self-contained cryo...

Diraq And Equinix To Deploy Australia’s First Commercial Quantum Computer

September 03, 2026 Equinix

Australian quantum startup Diraq has partnered with Equinix to deploy a quantum computer at an Equinix data center in Sydney. The eight-qubit system will use a silicon chip with self-contained cryogenic cooling and control electronics. The chip can be replaced to increase the qubit count without...

Read more
Read Equinix to Reuse Data Center Heat to Warm Homes in Milan
Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, E...

Equinix to Reuse Data Center Heat to Warm Homes in Milan

July 10, 2026 Equinix

Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, Equinix will design and operate the heat recovery system, while A2A will use four large-scale heat...

Read more
Read Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland
Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deploy...

Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland

June 19, 2026 Equinix

Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deployed two hydrogen-powered generators at its DB3 Data Center facility. The 12-week trial will support...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.