Data Center Campus
The Bilbao-Arasur Campus, located in the Arasur hub south of Bilbao, sits at a high-speed fiber junction. It features three data centers and an administrative building, with expansion potential. BIL03 is the first building of Edged Energy's Bilbao-Arasur Campus. The complex is powered by an adjacent 135 MW solar farm, ensuring affordable clean energy.
Buildings
| Site | Operator | Status | Operational | Building Size | Built |
|---|---|---|---|---|---|
| Edged Energy: BIL03 | Edged Energy |
Operational
|
░░░░ Request Dataset MW | ░░░░░░░ Request Dataset SqFt | 2024 |
| Edged Energy: BIL02 | Edged Energy |
Operational
|
░░░░ Request Dataset MW | — | 2026 |
| Edged Energy: BIL01 | Edged Energy |
Under Construction
|
— | — | 2027 |