DP Facilities: Mineral Gap

Latest Podcast 5978 Windswept Blvd
OperationalPlanned
Operational with future phases planned
Operated by:

DP Facilities: Mineral Gap

Utility Provider: Kentucky Power
Lot Size: 22 acres
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

Mineral Gap Data Center Campus is a highly secure, compliant, and regulated Uptime Institute Certified Tier III data center campus. Mineral Gap was initially built to provide U.S. agency clients and their contractors a state-of-the-art private solution to rival on-premise secure data center facilities.

Mineral Gap is a 65,000-square-­foot secure data center campus located on a 22-acre site in Wise County. Its key features include:
* Dedicated data halls, suites and cages to limit traffic.
* Diverse fiber providers supply multiple redundant routes into the facility.
* Designed with N+2 redundancy; requires no shutdowns for equipment replacement and maintenance.
* Mission­-critical components are protected by a redundant delivery path for power and cooling.
* Up to 45 MW of power, low-cost electricity, and an estimated PUE of 1.2.

Map and Nearby Locations

5978 Windswept Blvd
DP Facilities, Inc Sites
Nearby Facilities

Sites within 15 miles of DP Facilities: Mineral Gap

Distance Site About
0.18 miles Maverick Project
The Maverick Project is an ambitious, phased development in Wise County, Virginia, designed to transform a 450-acre former coal mine site into a premier hyperscale technology hub.
0.34 miles Maverick Project Expansion
14.74 miles Diversified Energy: Gateway Industrial Park
The proposed Letcher County data center is an early-stage, off-grid development planned for a 100-acre parcel within the Gateway Industrial Park in Jenkins, Kentucky.

DP Facilities: Mineral Gap Data Center Photos See all

Blue Generators
Source: Baxtel
Rendering of the DP facility in Wise County
Source: Baxtel

Operating Company

Operated by:
0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?