Polish Operator Emitel Acquires 2MW Data Center Outside Poland
May 26, 2026
Poland
The facility is a strategically located commercial and digital infrastructure asset situated near major transport corridors and within close proximity to Warsaw's primary airport networks. Integrated into DL Invest Group’s multi-facility European AI and cloud joint venture with Boosteroid and infrastructure operator Argentum AI, the site is architecturally prepared to transform portions of its land bank into modular, high-density computing server environments. The property features robust, multi-carrier fiber routing via partnerships with Netia, Polkomtel, and SkyNet, making it an optimal backup node to absorb and secure high-performance computing workloads for the Warsaw data center cluster.
| Distance | Site | About |
|---|---|---|
| 17.06 miles | Hyperscale Data Center Request Dataset | |
| 17.71 miles | Atman: Warsaw-3 Campus |
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
|
| 17.72 miles | Atman: WAW-3 Bldg2 |
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
|
| 17.75 miles | OVH Warsaw WAW1 | |
| 17.76 miles | Atman: WAW-3 Bldg3 |
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
|
| 18.50 miles | VOLT: Warsaw 1 |
Volt is potentially leasing capacity from Switch's Warsaw 1 data center facility.
|
| 18.76 miles | Switch Datacenters: Warsaw 1 |
|
| 19.53 miles | Data4: Warsaw 1 DC2 |
Data4’s second data center at its Jawczyce campus near Warsaw is a 10MW facility, expanding the multi-phase site toward a planned 60MW, four-building development on a 4-hectare campus.
|
| 19.56 miles | Hyperscale Data Center Request Dataset | |
| 19.58 miles | Data4: Warsaw 1 |
In 2023, Data4 Group opened their first Polish data center in the campus located in Jawczyce, near Warsaw, on a 4 hectares site.
|
| 19.62 miles | Data4: Warsaw 1 DC3 |
|
| 19.63 miles | Data4: Warsaw 1 DC4 |
|
| 19.97 miles | FR Investment: Kajetany |
Proposed by FR Investment Poland Sp. z o.o. (a subsidiary of the Futureal Group), the Kajetany data center is a planned facility located on a 2-hectare plot at Orlej street.
|
Established in 2009 and headquartered in Katowice, DL Invest Group operates under an integrated owner-operator business model, handling the entire property lifecycle from in-house design and general contracting to long-term asset and property management. Moving away from traditional "build-and-sell" practices, the company focuses on long-term portfolio ownership, building dedicated infrastructure like tailor-made built-to-suit (BTS) warehouses and small business units (SBUs) for the logistics and e-commerce sectors. Leveraging an expanding capital structure backed by international institutional financing, the group is executing a strategic expansion to develop high-density AI and cloud data center networks alongside its established industrial real estate portfolio.
May 26, 2026
Poland
April 16, 2026
Poland
April 09, 2026
Poland
February 04, 2026
Poland
January 03, 2026
Poland
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas