Go to PodcastThe 98,950 sf data center facility is equipped with two computer room pods. The pods are designed to support ~ 300 watts per square foot. The campus is designed to be expandable to support another 2 more buildings.
| Distance | Site | About |
|---|---|---|
| 0.12 miles | Ensono: 140 Riverside |
The Property will provide the ability to significantly increase utility power (25 megawatts +) through a separate agreement with the utility provider.
|
| 0.14 miles | T5 Kings Mountain |
A purpose-built, powered data center shell measuring 146,000 square feet and expandable to 468,000 square feet.
|
| 0.45 miles | AT&T Kings Mountain |
The $200 million data center was built in 2014 and is located on T5's Kings Mountain Data Center Park. The data center occupies 130 acres. The 14-year expansion plan calls for a total of 900,000 sqft of data floor space.
|
| 16.44 miles | Cielo Digital: Gaffney, SC |
Cielo Digital Infrastructure, a US-based operator, is set to develop a $2.1 billion data center campus in Cherokee County, South Carolina.
|
| 16.52 miles | Cielo Digital: Gaffney Expansion |