E11: Building India’s Digital Backbone with Sharad Agarwal
Mar 12, 2026
Eric Bell
World
The 98,950 sf data center facility is equipped with two computer room pods. The pods are designed to support ~ 300 watts per square foot. The campus is designed to be expandable to support another 2 more buildings.
| Distance | Site | About |
|---|---|---|
| 0.12 miles | Ensono: 140 Riverside |
The Property will provide the ability to significantly increase utility power (25 megawatts +) through a separate agreement with the utility provider.
|
| 0.14 miles | T5 Kings Mountain |
A purpose-built, powered data center shell measuring 146,000 square feet and expandable to 468,000 square feet.
|
| 0.45 miles | AT&T Kings Mountain |
The $200 million data center was built in 2014 and is located on T5's Kings Mountain Data Center Park. The data center occupies 130 acres. The 14-year expansion plan calls for a total of 900,000 sqft of data floor space.
|
| 16.44 miles | Cielo Digital: Gaffney, SC |
Cielo Digital Infrastructure, a US-based operator, is set to develop a $2.1 billion data center campus in Cherokee County, South Carolina.
|
| 16.52 miles | Cielo Digital: Gaffney Expansion |
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas