| Distance | Site | About |
|---|---|---|
| 1.09 miles | PLDT VITRO: Sta. Rosa |
VITRO Sta. Rosa hyperscale data center is located at Pulong Santa Cruz, Santa Rosa, Laguna, Philippines .
|
| 1.37 miles | A-Flow: ML1 Bldg-2 |
This facility is part of A-Flow's Laguna ML1 Campus in Philippines.
|
| 1.41 miles | A-Flow: Laguna ML1 |
A-Flow Properties I Corp. (A-Flow), a collaboration between Ayala Land, Inc. and PAG’s Flow Digital Infrastructure, is developing a data center in Biñan, Laguna.
|
| 1.46 miles | A-Flow: ML1 Bldg-3 |
This facility is part of A-Flow's Laguna ML1 Campus in Philippines.
|
| 1.80 miles | PLDT VITRO: Sta. Rosa 2 |
ePLDT's Vitro, the enterprise arm of Philippine telecommunications giant PLDT, has announced plans for a new data center in South Luzon.
|
| 2.91 miles | Equinix: C2 Data Center |
In 2024, Equinix acquired three data centers in the Philippines from Total Information Management, a local technology solutions provider.
|
| 2.92 miles | Equinix: Carmona 1 |
|
| 9.63 miles | Evolution DC: Manila |
The project will be built on a four-hectare property, with Phase 1 expected to begin operations in Q1 2026. The full deployment is planned to take place over a five-year period.
|
| 9.85 miles | STT Cavite 2 |
STT Cavite 2 covers an area of 4,500 square meters (48,440 square feet). This two-story facility is connected to two separate substations.
|
| 9.87 miles | STT Cavite 1 |
The STT Cavite campus opened in 2015 in General Trias. The Cavite 1 facility spans 3,600 sqm(38,750 sqft) of gross floor area.
|
| 13.45 miles | PLDT VITRO Parañaque |
|
| 14.58 miles | PLDT VITRO: Cavite |
PLDT Group is set to build its 12th data center in General Trias, Cavite, with construction starting in 2026 and completion expected by 2028.
|
| 14.64 miles | Converge ICT: Paranaque |
Converge ICT Solutions is developing a data center on a 1.4-hectare site in Parañaque City, Philippines.
|
| 16.49 miles | YCO: Batangas |
The facility, YCO Manila Digital is a two-story, 10,000 sqm data center consisting of four data halls.
|
| 18.69 miles | STT Makati |
This tier-3 aligned data center is trusted by international and local enterprises across different industries from tech giants, financial services, healthcare providers, among many others.
|
| 19.58 miles | PLDT VITRO Taguig |
Operational since 2011, the carrier-neutral ePLDT Taguig facility offers diverse building entry points and risers, housing 165 racks within its 545 sqm data center space.
|
October 09, 2025
Digital Edge DC
September 03, 2025
Digital Edge DC
January 06, 2025
Digital Edge DC
June 10, 2024
Digital Edge DC
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas