Comcast: Moorestown, NJ

Year Built: 2001
Floors: 3
Lot Size: 5 acres
░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

Built in 2001 and set on 5.1 acres, the three-story building spans 74,240 square feet (6,900 sqm). The first floor of the building is built out as a data center with a majority raised floor; the space is equipped with 14 Liebert HVAC units, four Liebert battery systems, and four Liebert power systems. The property floor plates average 24,750 sq ft (2,300 sqm).

  • 650 Centerton Road is currently owned by a "notable international credit tenant" and will be sold as a sale/leaseback on the first floor with an initial term of 12 months with an NNN reimbursement structure.

Map and Nearby Locations

650 Centerton Rd
Comcast Sites
Nearby Facilities

Comcast: Moorestown, NJ Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Comcast: Moorestown, NJ

Distance Site About
10.56 miles Mapletree: 2000 Kubach
2000 Kubach Road, Philadelphia is a two-storey data center. The property is part of Byberry West Industrial Park, which is located in the northeast section of Philadelphia.
13.27 miles Keystone NAP
Keystone’s facility is a repurposed former steel mill, which was converted into a data center building, was once the largest vertically integrated steel production site in the U.S.
13.67 miles Hyperscale Data Center Request Dataset
The planned facility, spanning 1 million square feet (92,905 square meters), will be operated as a data center by a tenant rather than by the property's owner, NorthPoint Development.
13.67 miles Northpoint: Keystone Trade Campus
NorthPoint Development has received approval to build a 2 million-square-foot data center campus within its Keystone Trade Center in Bucks County.
14.17 miles Lumen Philadelphia 2
14.49 miles Lightower Philadelphia 1309 Noble
14.51 miles 401 North Broad St - Netrality Philadelphia
Premier core interconnection data center in Philadelphia
14.51 miles Equinix Philadelphia PH1
14.51 miles Crown Castle 401 N Broad
14.51 miles DataBank Philadelphia PHL1
14.51 miles Lumen: 401 N Broad
14.53 miles 11:11 Systems: Philadelphia
11:11 Systems acquired this data center (along with other Sungard Availability Services assets) in November 2022.
14.54 miles Verizon: 401 Broad
14.64 miles H5 Philadelphia
14.68 miles 365 Philadelphia (Downtown)
Built 2009 inside 1500 Spring Garden Street, a 1947 former GlaxoSmithKline (SmithKline) corporate headquarters building converted by SunGard Availability Services. PA1 in 365's portfolio.
15.62 miles Quonix - Philadelphia
15.62 miles Lumen Philadelphia 4
15.62 miles Verizon: 2401 Locust
Former XO Communications facility
15.81 miles Lumen Philadelphia 3
16.08 miles TierPoint Philadelphia
The site, located in the South Philadelphia Navy Yard, is former XAND data center that was acquired by TierPoint in 2014
16.17 miles Carrier-Neutral Data Center Request Dataset
MicroLink is planning to build a data center in Philadelphia, Pennsylvania
16.39 miles 365 Philadelphia (University City)
Located in downtown Philadelphia at the Penn Medicine Science Center

Comcast: Moorestown, NJ Data Center Photos See all

Comcast data center in Moorestown, New Jersey
Source: Google Maps

Operating Company

Operated by:
6
Facilities
5
Markets
15MW
Megawatts

News See all

Read New Jersey Lawmakers Approve Bill Creating Large Load Data Center Tariff
New Jersey lawmakers have passed a bill directing the state’s Board of Public Utilities to create a dedicated tariff for data centers with capacities of 50MW or more, aimed at protecting other rate...

New Jersey Lawmakers Approve Bill Creating Large Load Data Center Tariff

July 03, 2026 New Jersey

New Jersey lawmakers have passed a bill directing the state’s Board of Public Utilities to create a dedicated tariff for data centers with capacities of 50MW or more, aimed at protecting other ratepayers from rising costs linked to new developments. The legislation, S731, replaces an earlier...

Read more
Read Local Officials Reject Proposed Data Center in New Brunswick, New Jersey
Local Officials Reject Proposed Data Center in New Brunswick, New Jersey

Local Officials Reject Proposed Data Center in New Brunswick, New Jersey

February 21, 2026 New Jersey

Local authorities in New Brunswick, New Jersey, voted on Wednesday against allowing the construction of a data center on a plot of land slated for redevelopment, instead requiring that a park be built on the site. The New Brunswick City Council was reviewing a proposal for the Jersey-Sandford...

Read more
Read New Jersey Senate Advances Bill to Establish New Rate Class for Data Centers
New Jersey Senate Advances Bill to Establish New Rate Class for Data Centers

New Jersey Senate Advances Bill to Establish New Rate Class for Data Centers

January 13, 2026 New Jersey

The New Jersey Senate has advanced a bill that would create new tariff classes for “large load” data centers in an effort to protect ratepayers in the state from cost increases.The bill, cosponsored by ten Democrat lawmakers, would require public electrical utilities in the state to submit...

Read more
Read Stack Overflow Fully Exits Data Centers
Stack Overflow Fully Exits Data Centers

Stack Overflow Fully Exits Data Centers

January 06, 2026 New Jersey

Stack Overflow, a question-and-answer website for computer programmers, has officially exited its data center in New Jersey as part of its cloud migration effort. Stack noted that for the past 16 years it had been operating out of a physical data center in which the site reliability engineer...

Read more
Read NJFX Plans 10MW Liquid-cooled Data Hall in New Jersey
NJFX Plans 10MW Liquid-cooled Data Hall in New Jersey

NJFX Plans 10MW Liquid-cooled Data Hall in New Jersey

December 01, 2025 New Jersey

NJFX is expanding its cable landing station and data center site in New Jersey. The firm said the move is supported by the execution of an electric utility load letter supported by a $3 million deposit, targeting power delivery by end of 2026. Bala Consulting Engineers is working with the company...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?