ClusterPower Craiova

Latest Podcast
Strada Viitorului nr.2
OperationalPlanned
Operational with future phases planned
Operated by:

ClusterPower Craiova

Site planned for 2026 and has expansions through 2029
PUE: 1.1
░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

Site History

  • June 2021: Construction begins on the first data center in the Mischii technology park, Dolj County.
  • April 2022: ClusterPower launches its first data center at the Mischii campus near Craiova; the ~EUR 40M first phase was built in roughly six months.
  • Jan 5, 2026: Accelerated Infrastructure Capital (AIC) announces an equity partnership with ClusterPower to co-develop an 800MW AI data center region in southwestern Romania, spanning the Mischii campus (MSC1) and a second site in Fauresti (FRS1), ~30km away. ClusterPower contributes secured land, power, an owned on-site substation, and on-site generation; AIC leads capital structuring and brings its data center development experience (AIC was formed in 2023 by co-founders of APAC operator Chayora).

Project Profile

  • Operator: ClusterPower, in equity partnership with Accelerated Infrastructure Capital (AIC).
  • Location: Mischii technology campus (MSC1), Dolj County, ~230km west of Bucharest, on a 25,427 sqm owned site.
  • Positioning: Nvidia-certified infrastructure targeting AI workloads; first hyperscale-class data center in southeastern Europe.
  • MSC1 ramp: three incremental build phases, with ready-for-service targets at end of 2026, end of 2027, and end of 2028 / early 2029.
  • Companion site: FRS1 in Fauresti is planned to add further capacity from 2029.
  • Power: on-site natural gas trigeneration plant plus an owned on-site substation.

Map and Nearby Locations:

Strada Viitorului nr.2
Cluster Power Sites
Nearby Facilities

ClusterPower Craiova Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of ClusterPower Craiova

Distance Site About
15.48 miles ClusterPower Fauresti (FRS1)
FRS1 is ClusterPower's second data center campus, located in Făurești, Vâlcea County, roughly 30km from the company's flagship Mischii (MSC1) campus near Craiova. It is the companion site in the 800MW AI data center region that ClusterPower and Accelerated Infrastructure Capital (AIC) announced in January 2026, with capacity planned to come online from 2029.

ClusterPower Craiova Data Center Photos (See all)

Operating Company

Operated by:

Founded in 2019, ClusterPower offers a one-stop-shop Artificial Intelligence infrastructure.

With a high performance computing infrastructure, ClusterPower brings to life the first hyper-scale data center in the region, allowing hosting and development of state-of-the-art digital solutions with high added value.