Cerebras: Oklahoma City

Latest Podcast
512 NW 62nd St
Operational
Fully operational facility
Operated by:

Cerebras: Oklahoma City

Year Built: 2025
░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

The Cerebras facility in Oklahoma City, launched in September 2025 in partnership with Scale Datacenters, is a cutting-edge data center dedicated to high-speed AI inference and supercomputing. It is designed to house over 300 of Cerebras' CS-3 Wafer-Scale Engine systems, providing an immense compute capacity reported to be over 44 exaflops of AI compute. This makes it one of the world's fastest AI infrastructures, utilizing direct-to-chip liquid cooling and matching all consumed power with renewable energy.

Historical Context


The site's history predates its use for advanced AI. The facility, an 82,000 sq ft structure located near NW 62nd Street, was originally built around 2013 for what was then Chesapeake Energy. This initial design as a corporate data center for an energy company gave it a robust foundation, including Tier III-quality infrastructure, and resilience against severe weather, such as seismic and tornado shielding, with triple redundant power stations.

The data center was later acquired by Scale Datacenters from the natural gas producer Expand Energy. Scale Datacenters then prepared the site and infrastructure to meet the demanding requirements of Cerebras' wafer-scale architecture, which uses the massive CS-3 chips. The strategic location was chosen for its combination of low costs, ample space, and resilient construction, positioning Oklahoma City as a significant hub for the next generation of generative AI computing.

Map and Nearby Locations:

512 NW 62nd St
Cerebras Systems Sites
Nearby Facilities

Sites within 15 miles of Cerebras: Oklahoma City

Distance Site About
4.25 miles TierPoint Oklahoma City
TierPoint has 2 data centers in Oklahoma City. OKC and OK2
4.50 miles Lumen Oklahoma City 1
5.10 miles MIDCON Oklahoma City
8.59 miles RACK59 Data Center
8.81 miles ValorC3: Oklahoma City
The Tier III data center, acquired by Tonaquint Data Centers in 2023, sits on a four-acre campus near Oklahoma City's Will Rogers World Airport, with easy access to Dallas-Fort Worth.
9.39 miles CloudBurst: Oklahoma City Campus
CloudBurst is building a new data center campus in Oklahoma. The first phase is due to go live in Q4 2026.

Cerebras: Oklahoma City Data Center Photos (See all)

Cerebras Systems launched data center in Oklahoma City
Source: Cerebras

Operating Company

Operated by:

Cerebras Systems is at the forefront of the generative AI revolution, building a new generation of AI supercomputers from the silicon up. Driven by their groundbreaking Wafer-Scale Engine-3, the world's largest and fastest AI processor, their flagship CS-3 systems deliver unparalleled speed and scale for both training and inference. Cerebras simplifies the creation and deployment of cutting-edge AI, empowering enterprises and open-source initiatives alike to push the boundaries of what's possible.

2
Facilities
0
Markets
15MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?