CDC: Kemps Creek, NSW

Latest Podcast 871 Mamre Rd
Planned
Future facility in planning stage
Operated by:

CDC: Kemps Creek, NSW

Short Code: KC1
Year Planned: 2028
Floors: 4
Lot Size: 218 acres

Australian provider CDC Data Centres plans for an AU$1.8 billion (US$1.2 billion) data center facility in Kemps Creek, western Sydney.

Located on an 88.4-hectare former agricultural site, the proposed development features a single four-story building, designated as KC1, spanning 34,000 square meters (365,970 sq ft) alongside an on-site substation building. The project marks a major expansion of CDC’s footprint in New South Wales, joining its existing Eastern Creek and Marsden Park developments, as the firm scales its broader 1.6 GW regional pipeline across Australia and New Zealand.

Map and Nearby Locations

871 Mamre Rd
Canberra Data Centres (CDC) Sites
Nearby Facilities

CDC: Kemps Creek, NSW Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of CDC: Kemps Creek, NSW

Distance Site About
1.04 miles Center GammaInterested in this information?Contact us
1.11 miles Point AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.19 miles AirTrunk: Kemps Creek
AirTrunk, the data center operator owned by Blackstone, has been identified as the prospective buyer for a significant data center campus planned for Western Sydney, Australia.
1.23 miles AirTrunk: Kemps Expansion
1.47 miles Stockland: Kemps Creek, NSW
Stockland and Fife Capital have filed plans to develop a 168MW hyperscale data center at 90 Aldington Road, Kemps Creek, Western Sydney, on a 92,400 sqm (995,000 sq ft) site. The project includes 12 data halls and a planned 1GW substation, with an estimated investment of AU$3.94 billion (US$2.7 billion), and is currently in the early SEARS planning stage.
2.49 miles Digital Realty: Erskine Park 2
Digital Realty's Erskine Park 2 data center (SYD11) is located adjacent to Erskine Park 1. Phase one, delivered in 2019, provides 86,327 sq ft of space, with a second phase planned.
2.57 miles Rackspace Erskine Park SYD2
2.57 miles Digital Realty Erskine Park (Sydney)
Digital Realty's Erskine Park 1 (SYD10) is located at 1-11 Templar Road in Erskine Park. The building houses four Digital Realty Turn-Key Flex areas within its 8,010 sq. m. of capacity.
2.97 miles Stack: SYD01B
SYD01B is the western building and second stage of STACK's SYD01 campus at 78 Lockwood Road, Erskine Park: a three-storey hyperscale data centre with 16 data halls on two levels.
3.02 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.02 miles Stack: SYD01A
SYD01A is the eastern building and first stage of STACK's SYD01 campus at 78 Lockwood Road, Erskine Park: a three-storey hyperscale data centre with 16 data halls on two levels, built with the campus substation and generator gantry.
3.05 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.06 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.11 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.92 miles Goodman: Project Atlas
Real estate giant Goodman Group has filed a SEARS application with the New South Wales government to develop a massive data center campus in Sydney’s Eastern Creek area.
3.97 miles CDC: Eastern Creek 5
This facility is part of Canberra Data Centres' Eastern Creek Sydney Campus.
3.98 miles CDC Eastern Creek 4
4.03 miles CDC: Eastern Creek 6
CDC Data Centers has begun construction of EC5 and EC6 at its Eastern Creek Campus in Sydney. Upon completion, the two data center buildings will provide 46,182 sqm of space.
4.06 miles CDC Eastern Creek 3
EC3 is the third data center building of CDC Eastern Creek Campus. Eastern Creek 3 became operational in 2021.
4.10 miles CDC Eastern Creek 2
4.12 miles CDC Eastern Creek 1
4.21 miles CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.25 miles NextDC: S7 Sydney
In 2024, NextDC acquired a 258,000 sqm (2.78 million sq ft) plot of land in Eastern Creek, Sydney, for AU$353 million (US$236.1 million) to develop a new data center named S7.
4.35 miles Tower BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.43 miles NorthInterested in this information?Contact us
5.18 miles Starwood-Doma: Minchinbury
A powerful new partnership is set to reshape Western Sydney’s digital landscape as Starwood Capital Group, Doma Infrastructure, and Telstra InfraCo join forces to develop a carrier-neutral data center in Minchinbury.
5.34 miles Keppel: Minchinbury, NSW
Keppel DC plans to build a data center on 5 acres of land in Minchinbury, New South Wales, Australia.
6.43 miles Central TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.45 miles Huntingwood & Brabham
6.54 miles AirTrunk SYD3 Sydney West
6.82 miles AirTrunk Sydney
6.84 miles Datacom: AirTrunk SYD1
Datacom operates dedicated and secure data halls within AirTrunk’s hyperscale SYD1 data center
6.87 miles DCI: SYD02
DCI Data Centers has received State Significant Development (SSD) approval for its SYD02/SYD03 data center. This facility will be constructed next to the existing SYD01 site in Huntingwood.
6.91 miles DCI Sydney Eastern Creek
Located at Eastern Creek, in the heart of Sydney's Western Region growth corridor, our SYD01 data centre has 11MW of power.
7.31 miles EdgeConneX: Wetherill 1
Stockland, in a 50:50 joint venture with global hyperscale operator EdgeConneX, is developing the Davis Road Data Centre in Wetherill Park, NSW.
7.35 miles Stockland: Wetherill Park NSW
Stockland, in a 50:50 joint venture with global hyperscale operator EdgeConneX, is developing the Davis Road Data Centre in Wetherill Park, NSW.
7.43 miles EdgeConneX: Wetherill 2
This facility is a part of Davis Road Campus in Wetherill Park, NSW.
8.50 miles Fujitsu Western Sydney Data Centre
8.50 miles South StationInterested in this information?Contact us
9.31 miles CDC: Marsden 1 DC2
DC1 Building 2 is a single-story structure that will contain two data halls.
9.32 miles CDC: Marsden 1 DC1
Australian operator Canberra Data Centres (CDC) is developing a large data center campus in Sydney. The 21-hectare campus will comprise six four-story data center buildings.
9.34 miles CDC: Marsden 2
DC2 is the second data center building of CDC Marsden Park Campus. The four story building will feature 24 data halls.
9.36 miles CDC: Marsden 3
DC3 is the third data center building of CDC Marsden Park Campus. The four story building will feature 24 data halls.
9.40 miles CDC: Marsden 4
DC4 is the fourth data center building of CDC Marsden Park Campus. The four story building will feature 24 data halls.
9.42 miles CDC: Marsden 5
DC5 is the fifth data center building of CDC Marsden Park Campus. The four story building will feature 24 data halls.
9.44 miles CDC: Marsden 6
DC6 is the sixth data center building of CDC Marsden Park Campus. The four story building will feature 24 data halls.
10.06 miles Goodman: Project Pluto
The site for this development is located at 132 McCredie Road, which was previously Castrol's headquarters.
10.82 miles Metro ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.88 miles Core TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.37 miles Edge ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.43 miles PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.55 miles Woolworths
12.79 miles Cloud StationInterested in this information?Contact us
12.83 miles Center GammaInterested in this information?Contact us
12.87 miles BetaInterested in this information?Contact us
13.51 miles GreenSquareDC: SYD1 Bldg1
GreenSquareDC, an Australian data center firm, is expanding its Brookhollow Avenue campus in Sydney.
13.57 miles Vocus: SYD02
13.58 miles GreenSquareDC: SYD1 Bldg2
GreenSquareDC aims to develop a new three-story data center on its Sydney Campus, spanning 10,705 sqm (115,227 sq ft).
14.67 miles Equinix: SY10x
SY10x, Equinix's second xScale data center in Sydney, will be located in Rosehill, near the Western Sydney CBD of Parramatta.
14.73 miles Equinix SY9X
SY9x, Equinix's first xScale data center in Sydney, is located in Rosehill, near the Western Sydney CBD of Parramatta.
15.70 miles Equinix SY6
The facility currently offers 5,554 sq m (approximately 60,000 sq ft) of white space and 1,035 sq m (11,000 sq ft) of separate rentable space, and only hosts enterprise customers.
16.73 miles Fujitsu Sydney Olympic Park (Homebush)
16.73 miles Prime CenterInterested in this information?Contact us
16.84 miles DXN-SYD01
17.66 miles Unisys Rhodes
18.86 miles Macquarie Park Campus 2
Macquarie Technology Group, an Australian tech company, plans to acquire more land in Sydney for a new data center campus.

Operating Company

Operated by:

Canberra Data Centres (CDC) is a carrier neutral data centre provider established in 2007.

0
Facilities
0
Markets

News See all

Read CDC Refiles Kemps Creek Plan, Lifting Sydney Campus to 1.4GW
[CDC](https://baxtel.com/data-centers/canberra-data-centres-cdc) has refiled its Kemps Creek data center plan, expanding a single 144MW building into a six-building campus rated at 1.4GW. The [New ...

CDC Refiles Kemps Creek Plan, Lifting Sydney Campus to 1.4GW

November 12, 2026 Canberra Data Centres (CDC)

CDC has refiled its Kemps Creek data center plan, expanding a single 144MW building into a six-building campus rated at 1.4GW. The New South Wales Department of Planning lists the revised State Significant Development application, SSD-133677993, at a total power consumption of 1.4GW. Baxtel...

Read more
Read AirTrunk Secures A$4.25B Green Loan for SYD3 Sydney Campus
AirTrunk has secured an [A$4.25 billion green loan](https://airtrunk.com/airtrunk-secures-a4-25b-green-loan-for-syd3-western-sydney-expansion-supporting-australias-digital-economy) to fund continue...

AirTrunk Secures A$4.25B Green Loan for SYD3 Sydney Campus

October 28, 2026 AirTrunk

AirTrunk has secured an A$4.25 billion green loan to fund continued development of its SYD3 campus in Western Sydney. Reuters put the facility at about US$2.98 billion. Thirty-two local and international financial institutions backed the debt, which 14 lead banks underwrote. AirTrunk develops and...

Read more
Read Princeton Digital Group Linked to A$1B, 100MW Sydney Data Centre
Planning documents filed with the [New South Wales](https://baxtel.com/regions/new-south-wales) government identify [Princeton Digital Group](https://baxtel.com/data-centers/princeton-digital-group...

Princeton Digital Group Linked to A$1B, 100MW Sydney Data Centre

October 26, 2026 Princeton Digital Group

Planning documents filed with the New South Wales government identify Princeton Digital Group as the client behind a 100-megawatt data centre in Sydney's southwest. The scoping report, first reported by Mingtiandi on Oct. 24, describes capital investment above A$1 billion (US$701 million). If...

Read more
Read Firmus and CDC Scrap 1.6GW Project Southgate With Just 42MW Built
[Firmus Technologies](https://baxtel.com/data-centers/firmus-technologies) and [CDC Data Centres](https://baxtel.com/data-centers/canberra-data-centres-cdc) have scrapped Project Southgate, their p...

Firmus and CDC Scrap 1.6GW Project Southgate With Just 42MW Built

October 06, 2026 Firmus Technologies

Firmus Technologies and CDC Data Centres have scrapped Project Southgate, their plan to build up to 1.6GW of AI factories across Australia, after deploying about 42MW, roughly 2.5 percent of the original target. "Firmus and CDC mutually agreed earlier this year not to proceed with the...

Read more
Read Starwood, Doma, and Telstra Plan New Facility in Sydney
Starwood, Doma, and Telstra Plan New Facility in Sydney

Starwood, Doma, and Telstra Plan New Facility in Sydney

November 14, 2025 Sydney

Starwood Capital Group, Doma Infrastructure Group, and Telstra InfraCo this week announced the formation of a strategic agreement to develop a carrier-neutral data center in Minchinbury, Western Sydney.Starwood Capital and Doma are responsible for financing, development, construction, and ongoing...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.