Green DC Córdoba is a proposed AI data center campus on about 124 hectares of leased rural land at the Matasanos estate (Cortijo San Antonio de Peralta), about 12 km south-west of central Córdoba. Blackberry AIF announced it in 2024 as GDC Córdoba, with on-site solar, and holds it through its project company DC Estate Córdoba SL. Later plans moved to on-site natural-gas fuel cells.
EdgeMode held a stake through a 2026 joint venture with Blackberry AIF, which Blackberry AIF ended in September 2026. In July 2026 Pure Data Centres signed a non-binding term sheet with EdgeMode that named the Córdoba site. No grid connection, environmental decision or building licence has been published.
Site History
- September 2026: Blackberry AIF ends its joint venture with EdgeMode and takes back the project company.
- July 2026: Pure Data Centres signs a non-binding term sheet that names the Córdoba site.
- September 2024: Blackberry AIF announces GDC Córdoba.
- July 2024: The land is leased for 35 years.