Blackberry AIF: Green DC Córdoba

Site planned for 2028 and has expansions through 2030
Lot Size: 307 acres

Green DC Córdoba is a proposed AI data center campus on about 124 hectares of leased rural land at the Matasanos estate (Cortijo San Antonio de Peralta), about 12 km south-west of central Córdoba. Blackberry AIF announced it in 2024 as GDC Córdoba, with on-site solar, and holds it through its project company DC Estate Córdoba SL. Later plans moved to on-site natural-gas fuel cells.

EdgeMode held a stake through a 2026 joint venture with Blackberry AIF, which Blackberry AIF ended in September 2026. In July 2026 Pure Data Centres signed a non-binding term sheet with EdgeMode that named the Córdoba site. No grid connection, environmental decision or building licence has been published.

Site History

  • September 2026: Blackberry AIF ends its joint venture with EdgeMode and takes back the project company.
  • July 2026: Pure Data Centres signs a non-binding term sheet that names the Córdoba site.
  • September 2024: Blackberry AIF announces GDC Córdoba.
  • July 2024: The land is leased for 35 years.

Map and Nearby Locations

Finca Matasanos (Cortijo San Antonio de Peralta)
Blackberry AIF Sites
Nearby Facilities

Blackberry AIF: Green DC Córdoba Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by:

Blackberry AIF (BAIF) is a Spanish data center developer based in Seville and led by José Antonio Mora. It develops large AI campuses on leased rural land through one project company per site, under its IberData Hub platform, and plans on-site power from solar, batteries and natural-gas fuel cells. Its projects include sites in Mora (Toledo), Córdoba, Vianos (Albacete), Torrecampo (Córdoba), Cáceres and Tomelloso (Ciudad Real). In 2026 it formed a holding company, Black Artificial Intelligence SL, for its newer project companies.

Blackberry AIF History:

  • In September 2026, Blackberry AIF ended its joint venture with EdgeMode and took back the project companies.
  • In January 2026, Blackberry AIF and EdgeMode formed a joint venture over five Spanish campus projects.
  • In July 2025, Blackberry AIF and EdgeMode announced plans to combine.
  • In September 2024, Blackberry AIF announced its first green data center project, GDC Córdoba.
  • Founded in 2024 in Seville.
0
Facilities
0
Markets

News See all

Read Spain Approves Data Center Decree Requiring 80 Percent Renewable Power
Spain's Council of Ministers approved a royal decree on Nov. 20 that ties large data centers' grid access to renewable energy use. [Royal Decree 1032/2026](https://www.boe.es/diario_boe/txt.php?id=...

Spain Approves Data Center Decree Requiring 80 Percent Renewable Power

November 23, 2026 Spain

Spain's Council of Ministers approved a royal decree on Nov. 20 that ties large data centers' grid access to renewable energy use. Royal Decree 1032/2026 was published in the Official State Gazette on Nov. 21 and entered into force on Nov. 22. The approval follows Baxtel's October...

Read more
Read Merlin Pauses Two Bilbao Data Center Buildings, Cuts MEGA Plan to 704MW
[Merlin Properties](https://baxtel.com/data-centers/merlin-properties) has paused work on two buildings at its [Bilbao-Arasur data center campus](https://baxtel.com/data-center/merlin-bilbao-arasur...

Merlin Pauses Two Bilbao Data Center Buildings, Cuts MEGA Plan to 704MW

November 19, 2026 Merlin Properties

Merlin Properties has paused work on two buildings at its Bilbao-Arasur data center campus after failing to secure an electricity supply for them. The suspension covers Arasur 4 and Arasur 5 in Álava, in Spain's Basque Country. Chief executive Ismael Clemente confirmed the halt at...

Read more
Read Spain Raises Data Center Threshold to 10MW in Revised Renewables Decree
[Spain](https://baxtel.com/regions/spain) has raised the threshold at which its draft data center rules apply to 10MW from 1MW. The Ministry for Ecological Transition and the Demographic Challenge ...

Spain Raises Data Center Threshold to 10MW in Revised Renewables Decree

October 27, 2026 Spain

Spain has raised the threshold at which its draft data center rules apply to 10MW from 1MW. The Ministry for Ecological Transition and the Demographic Challenge sent the revised decree to the Council of State on October 26, Reuters reported. The text replaces an August draft that covered...

Read more
Read Spain Proposes Rules Requiring Data Centers To Source 80% Of Power From New Renewables
Spain is preparing legislation that would require data centers of 1MW or more to source at least 80% of their electricity from new renewable generation on an hourly basis. The draft rules, approved...

Spain Proposes Rules Requiring Data Centers To Source 80% Of Power From New Renewables

August 26, 2026 Spain

Spain is preparing legislation that would require data centers of 1MW or more to source at least 80% of their electricity from new renewable generation on an hourly basis. The draft rules, approved for fast-track legislation, would apply only to new data centers and undergo public consultation...

Read more
Read Solaria Launches European Data Center Platform
Solaria Launches European Data Center Platform

Solaria Launches European Data Center Platform

November 25, 2025 Spain

Spanish energy firm Solaria Energia has formally launched its European sustainable data center platform. The platform includes approximately 3.4GW of secured grid power across 400 hectares (990 acres) spanning Spain, Italy, Germany, and the UK. In addition, the company has reportedly requested...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.