Blackberry AIF: DC Malpica

Latest Podcast Paraje Pozo Amargo, TO-2836
In Doubt
The development is facing regulatory or community opposition
Operated by:

Blackberry AIF: DC Malpica

Site planned for 2028 and has expansions through 2029
Lot Size: 260 acres

DC Malpica is a proposed AI data center campus on about 105 hectares of leased farmland beside the TO-2836 road, north of Mora in the province of Toledo. Blackberry AIF promotes it through its project company DC Estate Malpica SL. The design calls for two development areas with on-site power from natural-gas solid oxide fuel cells supplied by Bloom Energy, plus rooftop solar, so the campus would not need a grid connection.

EdgeMode held a stake in the project through a 2026 joint venture with Blackberry AIF. Blackberry AIF ended that joint venture in September 2026 after EdgeMode missed its payments, and EdgeMode, which has suspended operations, did not cure the default by the November 2026 deadline. The project entered regional environmental consultations in mid-2026; no environmental decision or building licence has been published.

Site History

  • November 2026: EdgeMode's cure period under the joint venture lapses.
  • September 2026: Blackberry AIF ends its joint venture with EdgeMode and takes back the project company.
  • July 2026: The project enters regional environmental consultations.
  • June 2026: Mora signs a memorandum of understanding for the project, and EdgeMode receives a non-binding offer for the project company.
  • December 2025: The town issues a favourable urban compatibility report and Enagás grants a gas supply point, according to EdgeMode's filings.
  • February 2025: The land is leased for 35 years.

Map and Nearby Locations

Paraje Pozo Amargo, TO-2836
Blackberry AIF Sites
Nearby Facilities

Blackberry AIF: DC Malpica Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Blackberry AIF: DC Malpica

Distance Site
6.70 miles Blackberry AIF: DC Villasequilla
18.30 miles Blackberry AIF: GDC Ardosa
18.40 miles Blackberry AIF: GDC Lobera

Operating Company

Operated by:

Blackberry AIF (BAIF) is a Spanish data center developer based in Seville and led by José Antonio Mora. It develops large AI campuses on leased rural land through one project company per site, under its IberData Hub platform, and plans on-site power from solar, batteries and natural-gas fuel cells. Its projects include sites in Mora (Toledo), Córdoba, Vianos (Albacete), Torrecampo (Córdoba), Cáceres and Tomelloso (Ciudad Real). In 2026 it formed a holding company, Black Artificial Intelligence SL, for its newer project companies.

Blackberry AIF History:

  • In September 2026, Blackberry AIF ended its joint venture with EdgeMode and took back the project companies.
  • In January 2026, Blackberry AIF and EdgeMode formed a joint venture over five Spanish campus projects.
  • In July 2025, Blackberry AIF and EdgeMode announced plans to combine.
  • In September 2024, Blackberry AIF announced its first green data center project, GDC Córdoba.
  • Founded in 2024 in Seville.
0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.