E11: Building India’s Digital Backbone with Sharad Agarwal
Mar 12, 2026 Eric Bell World
Go to PodcastDC Villasequilla is a proposed AI data center campus in Villasequilla, Toledo. It was added to the EdgeMode and Blackberry AIF joint venture pipeline in January 2026, when its land had not yet been secured. The agreement called for a project company, DC Villasequilla SL, to be formed within three months; none has been registered. The joint venture replaced that pipeline with an updated, unnamed one in March 2026, and Blackberry AIF ended the joint venture in September 2026. No land deal or permit has been published.
| Distance | Site | About |
|---|---|---|
| 6.70 miles | Blackberry AIF: DC Malpica |
Proposed off-grid AI data center campus on about 105 hectares beside the TO-2836 road north of Mora, Toledo, promoted by Blackberry AIF.
|
| 15.79 miles | Blackberry AIF: GDC Lobera |
Small green data center in an undisclosed location in Spain that Blackberry AIF listed in its IberData Hub pipeline in 2024; no plans have been published since.
|
| 18.50 miles | Box2bit: AXIS South |
Proposed data center campus by Box2bit in Recas, Toledo, announced in 2022.
|
Blackberry AIF (BAIF) is a Spanish data center developer based in Seville and led by José Antonio Mora. It develops large AI campuses on leased rural land through one project company per site, under its IberData Hub platform, and plans on-site power from solar, batteries and natural-gas fuel cells. Its projects include sites in Mora (Toledo), Córdoba, Vianos (Albacete), Torrecampo (Córdoba), Cáceres and Tomelloso (Ciudad Real). In 2026 it formed a holding company, Black Artificial Intelligence SL, for its newer project companies.
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to PodcastTell us what you're looking for. We respond within one business day.