Blackberry AIF: GDC Ardosa

Withdrawn
Project cancelled before construction
Operated by:

Blackberry AIF: GDC Ardosa

Year Planned: 2027

GDC Ardosa is a small, colocation-focused green data center that Blackberry AIF listed in December 2024 among the smaller projects of its IberData Hub portfolio, planned with grid power and solar self-consumption. Blackberry AIF never published a site, plot or permit for it. The project was not among the sites EdgeMode took into its joint venture with Blackberry AIF, and Blackberry AIF has since said it develops data centers of at least 50 MW.

Site History

  • February 2025: Blackberry AIF says it develops data centers of at least 50 MW.
  • December 2024: Blackberry AIF lists GDC Ardosa in its IberData Hub pipeline.

Map and Nearby Locations

La Ardosa
Blackberry AIF Sites
Nearby Facilities

Blackberry AIF: GDC Ardosa Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Blackberry AIF: GDC Ardosa

Distance Site
18.30 miles Blackberry AIF: DC Malpica

Operating Company

Operated by:

Blackberry AIF (BAIF) is a Spanish data center developer based in Seville and led by José Antonio Mora. It develops large AI campuses on leased rural land through one project company per site, under its IberData Hub platform, and plans on-site power from solar, batteries and natural-gas fuel cells. Its projects include sites in Mora (Toledo), Córdoba, Vianos (Albacete), Torrecampo (Córdoba), Cáceres and Tomelloso (Ciudad Real). In 2026 it formed a holding company, Black Artificial Intelligence SL, for its newer project companies.

Blackberry AIF History:

  • In September 2026, Blackberry AIF ended its joint venture with EdgeMode and took back the project companies.
  • In January 2026, Blackberry AIF and EdgeMode formed a joint venture over five Spanish campus projects.
  • In July 2025, Blackberry AIF and EdgeMode announced plans to combine.
  • In September 2024, Blackberry AIF announced its first green data center project, GDC Córdoba.
  • Founded in 2024 in Seville.
0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.