Big Digital Energy: Bellefonte, PA

Latest Podcast
950 Railroad Ave
Operational
Fully operational facility
Operated by:

Big Digital Energy: Bellefonte, PA

Year Built: 2024
░░░ Request Dataset MW
Total Power

The Bellefonte, Pennsylvania facility operated by Big Digital Energy (formerly Mawson Infrastructure Group) is a modular data center site primarily used for digital asset mining and emerging GPU/HPC workloads.

Map and Nearby Locations:

950 Railroad Ave
Big Digital Energy Sites
Nearby Facilities

Big Digital Energy: Bellefonte, PA Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Big Digital Energy: Bellefonte, PA

Distance Site About
0.00 miles Big Digital Energy: Midland, PA
Mawson Infrastructure Group Inc has deployed its Modular Data Centre (MDC) bitcoin mining solution to the Midland site. The Midland site now has a total capacity of 120 MW.
1.63 miles Standard Power: Beaver Valley
Standard Power, a blockchain company, has partnered with Vistra Corp. to construct a large-scale, carbon-free data center adjacent to the Beaver Valley nuclear power plant in Shippingport, Pennsylvania.
1.87 miles Aligned: Shippingport Industrial Park
Aligned Data Centers’ Project Phoenix is a massive $10 billion redevelopment of the former Bruce Mansfield coal plant in Shippingport, Pennsylvania.
15.90 miles Provident: Pittsburgh, Pennsylvania
The proposed redevelopment of the former Pitt International Race Complex in Wampum, Pennsylvania, represents a massive 400-acre land banking play by Texas-based developer Provident Data Centers.
15.90 miles Switch: Big Beaver
Switch is planning a new data center campus on the former Pittsburgh International Race Complex property in Big Beaver Borough, northwest of Pittsburgh, expanding its U.S. campus footprint into Pennsylvania.
18.61 miles DataBank Pittsburgh PIT2
Databank acquired the facility in 2019 from PNC Bank in a sale-leaseback transaction. BNC Bank occupies the entire second floor.

Big Digital Energy: Bellefonte, PA Data Center Photos (See all)

Operating Company

Operated by:

Mawson Infrastructure Group officially rebranded as Big Digital Energy in April 2026, signaling a strategic pivot from pure-play cryptocurrency mining toward a broader digital infrastructure model focused on AI and high-performance computing (HPC).

3
Facilities
0
Markets
153MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?