Aphorio Carter: Harrisonburg, VA

Latest Podcast 1175 N Main Street
OperationalPlanned
Operational with future phases planned
Operated by:

Aphorio Carter: Harrisonburg, VA

Site was first built in 2010 and has expansions through 2027
Utility Provider: Harrisonburg Electric Commission
Lot Size: 13 acres
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power

This single-story data center at 1175 North Main Street sits on 12.96 acres in Harrisonburg, Virginia. An affiliate of Carter Funds, the parent of Aphorio Carter, has owned the property since 2022. Anthem Health has leased the full building since 2015.

History:


  • DBT-Data bought the former Tyco building in 2008 and converted it into a data center. Carpathia Hosting anchored it as the Blue Ridge Data Center.
  • Harris Corporation bought the facility in 2010 and ran it as a cyber integration center.
  • DBT-Data bought the building back in 2013. GI Partners acquired it in 2014.
  • An affiliate of Carter Funds bought the property in 2022.
  • Directories also list the site as QTS Harrisonburg, after QTS acquired Carpathia in 2015.

Building:


  • Dual 20 MW electrical transformers on the property, served by two separate substations
  • Outside the 50-mile nuclear risk zone of Washington, D.C.
  • 100-foot setbacks

Power:


  • 12 sets of 2.5 MW Caterpillar generators in an N+1 configuration
  • Dual-fed power distribution units in an N+1 configuration, with 750 kVA UPS systems
  • Redundant chilled water plant that supports over 120 watts per square foot, in 2N up to N+3 configurations
  • Design supports individual direct expansion (DX) units for each tenant, up to N+3

Map and Nearby Locations

1175 N Main Street
Aphorio Carter Sites
Nearby Facilities

Aphorio Carter: Harrisonburg, VA Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Aphorio Carter: Harrisonburg, VA

Distance Site About
1.01 miles Segra Harrisonburg

Operating Company

Operated by:

Aphorio Carter, a division of Carter Funds, specializes in investing in mission-critical infrastructure and data center real estate across the United States. Headquartered in Tampa, Florida, the firm focuses on building a portfolio of real estate that supports the increasing demand for AI, data storage, and digital networking infrastructure companies need to operate their businesses.

Led by a seasoned team with a track record of acquiring 125 data centers worldwide, Aphorio Carter aggregates and manages portfolios of digital infrastructure assets with high occupancies and high-quality, credible tenants, often a part of the Fortune 500.

Aphorio Carter's recently refreshed brand reflects its commitment to advancing the future of investing in technology-driven real estate, where innovation meets opportunity in the world of AI, data centers and digital real assets.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Fluidstack Starts Construction on 99-Acre Wythe County Data Center Campus
Fluidstack has begun construction on a 99-acre data center campus at Progress Park in Wythe County, Virginia, [WDBJ reported](https://www.wdbj7.com/2026/10/29/fluidstack-hosts-open-house-wythe-coun...

Fluidstack Starts Construction on 99-Acre Wythe County Data Center Campus

November 10, 2026 Fluidstack

Fluidstack has begun construction on a 99-acre data center campus at Progress Park in Wythe County, Virginia, WDBJ reported. Wythe County is the only locality in the New River Valley with a data center under construction, WSLS reported. The campus is called Solis Arx. Wythe County and the Joint...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.