Data Center Campus
QTS Suwanee 1 is a two-building data center campus on Satellite Boulevard NW in Suwanee, north of Atlanta. First built in 2000, with fit-out of the second building planned through 2027.
QTS Suwanee 1 is a two-building data center campus on Satellite Boulevard NW in Suwanee, Gwinnett County, Georgia, in the north suburbs of Atlanta. QTS describes it as a 53-acre campus; the two building parcels total about 60 acres (40 at DC1, 20 at DC2).
The buildings share a redundant campus fiber conduit system with four diverse fiber entrances, on-site EV charging, and 24-hour security. QTS lists the location as "Suwanee 1" on its website. QTS has not filed plans for a third building; future campus capacity is tracked on QTS: Suwanee 1 Expansion.
Buildings
| Site | Operator | Status | Operational | Building Size | Built |
|---|---|---|---|---|---|
| QTS: Suwanee 1 DC1 | QTS Data Centers |
Operational
|
░░░░ Request Dataset MW | ░░░░░░░ Request Dataset SqFt | 2000 |
| QTS: Suwanee 1 DC2 | QTS Data Centers |
OperationalPlanned
|
░░░░ Request Dataset MW | ░░░░░░░ Request Dataset SqFt | 2023 |
| QTS: Suwanee 1 Expansion | QTS Data Centers |
Land Bank
|
— | — | — |
QTS Data Centers is a privately held data center company owned by funds managed by Blackstone, with corporate headquarters in Overland Park, Kansas. It provides colocation, custom data center and managed services, along with carrier-neutral connectivity across its platform.
QTS operates sites in the United States and in the Netherlands. The company expanded its footprint with acquisitions in Chicago and Princeton in 2014, added government and managed hosting capabilities with the Carpathia acquisition in 2015, and entered the Netherlands market in 2019. QTS became a public company in 2013 and was taken private in 2021.