Data Center Campus

Microsoft: La Porte Campus

Under ConstructionPlanned
Multi-phase construction project
Developed by:

Campus at a Glance

17 data centers on this campus
First built in 2029 with expansions through 2032
Coordinates: 41.58286, -86.69217
░░░ Request Dataset MW
Operational
░░░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

Building 1 is the northernmost data center on Microsoft’s original La Porte property, positioned close to Boyd Boulevard and the main campus entrance. The building is part of the first three-facility construction program and is scheduled to be completed in early spring 2029.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Point TwoInterested in this information?Contact us Microsoft Azure
Under Construction
— — 2029
Prime ValleyInterested in this information?Contact us Microsoft Azure
Under Construction
— — 2029
Valley MaxInterested in this information?Contact us Microsoft Azure
Under Construction
— — 2029
PrimeInterested in this information?Contact us Microsoft Azure
Planned
— — 2029
Prime RidgeInterested in this information?Contact us Microsoft Azure
Planned
— — 2030
Station BetaInterested in this information?Contact us Microsoft Azure
Planned
— — 2030
EastInterested in this information?Contact us Microsoft Azure
Planned
— — 2031
PrimeInterested in this information?Contact us Microsoft Azure
Planned
— — 2031
StationInterested in this information?Contact us Microsoft Azure
Planned
— — 2031
Ridge GammaInterested in this information?Contact us Microsoft Azure
Planned
— — 2031
PlusInterested in this information?Contact us Microsoft Azure
Planned
— — 2031
Station MaxInterested in this information?Contact us Microsoft Azure
Planned
— — 2032
Metro ParkInterested in this information?Contact us Microsoft Azure
Planned
— — 2032
Center ThreeInterested in this information?Contact us Microsoft Azure
Planned
— — 2032
GlobalInterested in this information?Contact us Microsoft Azure
Planned
— — 2032
Hub PlusInterested in this information?Contact us Microsoft Azure
Planned
— — 2032
West CampusInterested in this information?Contact us Microsoft Azure
Planned
— — 2032

Map and Nearby Locations

Microsoft: La Porte Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Developer

Developed by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News

Read NiSource And Microsoft Sign 20-Year Deal For 1,100MW Of Indiana Power
Microsoft will fund about 1,100 MW of new generation and transmission in northern Indiana and buy the output for 20 years under an agreement with [NiSource](https://www.nisource.com/news/article/ni...

NiSource And Microsoft Sign 20-Year Deal For 1,100MW Of Indiana Power

October 19, 2026 Microsoft Azure

Microsoft will fund about 1,100 MW of new generation and transmission in northern Indiana and buy the output for 20 years under an agreement with NiSource, the holding company that owns Northern Indiana Public Service Company. Announced Friday, the deal covers the La Porte data center campus...

Read more