Data Center Campus

Karis: Merrillville Campus

Karis Critical's proposed nine-building data center campus on about 180 acres off E 101st Ave in Merrillville, Indiana, crossed by a NIPSCO 138 kV line. Rezoned in 2024, it has stalled under Merrillville's data center moratorium, which now runs to 2028.

PlannedLand BankProspective Expansion
Future facility in planning stagefacility with additional land secured and prospective expansion planned
Developed by:

Campus at a Glance

2 data centers on this campus
First built in 2029 with expansions through 2033
Coordinates: 41.4395, -87.30532
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

Karis Critical proposed this data center campus in 2024 on about 180 acres along E 101st Ave, east of the Deep River, in Merrillville, Lake County, Indiana. Merrillville Holdings LLC owns the two parcels of record. An adjoining 28-acre parcel at 2010 E 101st Ave belongs to Merrillville Holdings 28 LLC, which uses Karis's Lisle, Illinois office address. The land sits in the town's Silos East economic development area.

Plan. Karis outlined up to nine buildings at about $100 million each. Karis develops the land and planned to sign an end user once approvals were in hand. None has been named.

Power. NIPSCO serves the site. A NIPSCO 138 kV line crosses the land, and NIPSCO's 345 kV Olive-St. John line runs about 1.5 miles north. The town's 2024 review found that existing lines could serve the first two buildings and that the rest would need new transmission. Karis agreed to fund a $500,000 NIPSCO infrastructure study.

Approvals. The Data Center Citizen Advisory Committee endorsed the project, and the Town Council approved the zoning change 7-0 in September 2024. Plan Commission approval of a planned unit development was still required. On May 26, 2026 the council adopted a one-year data center moratorium starting June 1, 2026. In July 2026 it extended the moratorium through January 1, 2028.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Karis: Merrillville 1 Karis Critical
Planned
— — 2029
Karis: Merrillville Campus Expansion Karis Critical
Land BankPlannedProspective Expansion
— — 2030

Map and Nearby Locations

Karis: Merrillville Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Developer

Developed by:

Karis Critical invests in the land, energy & ​infrastructure behind the world's data ​center ecosystem.

0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?