Google is building its Project Dazzler data center campus on about 792 acres of former Norfolk Southern land along Gallia Pike in Franklin Furnace, Scioto County, Ohio. Construction began in 2026, with completion planned for 2029.

3 sites Southern Ohio
Under ConstructionLand Bank
Under construction with additional land secured
Developed by:

Campus at a Glance

3 data centers on this campus
First built in 2027 with expansions through 2029
Coordinates: 38.6064, -82.8333
░░░ Request Dataset MW
Operational
░░░░░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

Google is developing the campus, known as Project Dazzler, in the Haverhill area of Green Township, Scioto County, along the Ohio River. Its affiliate Tilted Gate LLC assembled the land from Norfolk Southern rail property and holds the permits.

Facilities. Beyond the two data halls, the plan includes a two-story office building, a shipping and receiving building, two light-industrial support buildings, a water booster station and two security entrances. Land west of Gallia Pike is set aside for two more building locations. Google has not announced dates for them.

Power. AEP Ohio serves the campus. AEP is building the Razzler 765/345 kV station on a 61-acre pad at the north end of the site, plus a temporary 138 kV feed and switching station for the first load. Ohio EPA's draft air permit covers 197 emergency diesel generators and 32 cooling towers.

Incentives. In January 2026, the Scioto County Commission approved a 15-year, 75% tax abatement and named Google as the developer. Google will pay $500,000 a year in lieu of taxes. Residents sued the commission under Ohio's Open Meetings Act over the abatement in early 2026.

Construction. Mass excavation began in summer 2026, supported by an on-site concrete plant.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Station ThreeInterested in this information?Contact us Google
Under Construction
— — 2027
Cloud HubInterested in this information?Contact us Google
Under Construction
— — 2029
EastInterested in this information?Contact us Google
Land Bank
— — —

Map and Nearby Locations

Google: Franklin Furnace Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Developer

Developed by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.