Data Center Campus

Edged Energy: DFW01 Campus

Edged's Dallas campus at Loop 12 and Wildwood Drive in Irving holds a converted-warehouse data center opened in 2025 and a second building under construction.

2 sites Dallas
Under ConstructionOperationalPlanned
Operational facility with ongoing expansion and future phases planned
Developed by:

Campus at a Glance

2 data centers on this campus
First built in 2025 with expansions through 2028
Total building size: ░░░░░░░ Request Dataset SqFt
Coordinates: 32.817, -96.9188
░░░░ Request Dataset MW
Operational
░░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

In January 2025, Edged Energy launched its data center in Irving, Texas. The project is named ‘Edged DFW Data Center’. The company invested $35 million in the Dallas County project, which ran from September 2023 to January 2025.

  • 162,545 sq ft building
  • New build construction; two stories with two loading dock bays
  • UPS with N+1 redundancy
  • Generators with N+1 redundancy
  • Standby generation systems utilize Tier 4 Final engines which reduce NOx and particulate matter emissions by up to 99%
  • Redundant A+B side distribution

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Edged Energy: DFW01-1 Edged Energy
Under ConstructionOperationalPlanned
░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2025
Edged Energy: DFW01-2 Edged Energy
Under Construction
— — 2028

Map and Nearby Locations

Edged Energy: DFW01 Campus Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Developer

Developed by:

Edged Energy is a colocation and data center provider. The company also has data centers in development across the US.

Its Spain business is a subsidiary of Endeavour in collaboration with Merlin Properties.

0
Facilities
0
Markets
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.