Data Center Campus

EdgeCore: Phoenix Mesa Campus

4 sites Phoenix
PlannedOperationalUnder Construction
Operational facility with ongoing expansion and future phases planned
Operated by:

Campus at a Glance

4 data centers on this campus
First built in 2019 with expansions through 2027
Total building size: 1,069,311 SqFt
Coordinates: 33.34406, -111.61966
░░░░░ Request Dataset MW
Operational
░░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

The EdgeCore Mesa campus, initially planned for up to seven buildings, is undergoing significant expansion. In 2025, an additional 43.87 acres was added to the existing 40-acre facility, bringing the total land to nearly 84 acres.

The first data hall (PH01) was completed in 2019, encompassing 200,880 square feet with a 20,000 square feet for office and support space included .

In 2023, EdgeCore announced plans to construct two new data center buildings (PH02 and PH03) after acquiring approximately 15 acres previously owned by Meta Platforms Inc. The two developments would collectively serve as a six-building "integrated flagship campus," 

PH01 Features


  • Building Size: 200,880 sq. ft.
  • Fit Out: Powered shell, infrastructured shell, turn-key
  • Power Availability: AC & DC
  • Sustainability: Renewable power available, Green Globes® certified
  • Environment: LEED building design
  • Amenities: Dual loading docks, tech lounge, office space
  • UPS: N, N+1, and 2N configurations with lithium-ion batteries
  • Generators: Backup generators supporting N, N+1, and 2N configurations

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
EdgeCore: Mesa Expansion EdgeCore Internet Real Estate, LLC
Planned
— — 2027
EdgeCore: PH01 EdgeCore Internet Real Estate, LLC
Operational
░░░░ Request Dataset MW 200,880 SqFt 2019
EdgeCore: PH02 EdgeCore Internet Real Estate, LLC
Operational
░░░░░ Request Dataset MW 868,431 SqFt 2026
EdgeCore: PH03 EdgeCore Internet Real Estate, LLC
Under Construction
— — 2026

Map and Nearby Locations

EdgeCore: Phoenix Mesa Campus Power Growth Over Time

+415% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

Edgecore is headquartered in Denver, Colorado. It operates under the EdgeCore Digital Infrastructure brand and focuses on large, high-density campuses for hyperscale customers. Partners Group acquired the platform in November 2022 and later completed an additional equity investment in 2024. Current and planned development includes Mesa in Greater Phoenix, Santa Clara in Silicon Valley, the Tahoe-Reno Industrial Center near Reno, and multiple sites in Virginia including Ashburn, Culpeper, and Louisa County.

History:

  • 2025 Jun: Announced plans to invest $17B+ in a Louisa County, Virginia
  • 2024 Jul: Announced a new hyperscale campus in Culpeper, Virginia.
  • Edgecore
  • 2024 Sep: Partners Group completed a USD 1.9 billion equity investment in EdgeCore Digital Infrastructure.
  • 2023 Oct: Introduced a new brand identity as EdgeCore Digital Infrastructure.
  • 2023 Jan: Broke ground on a data center campus in Santa Clara, California.
  • 2022 Nov: Acquired by Partners Group.
  • 2017 company founded