Data Center Campus

Dermody: Social Circle Campus

Dermody Properties' planned four-building data center campus on 96 acres along East Hightower Trail in Social Circle, Georgia, approved by the city in November 2025. First building planned for 2028, with build-out planned through 2030.

2 sites Atlanta
Planned
Future facility in planning stage
Developed by:

Campus at a Glance

2 data centers on this campus
First built in 2028 with expansions through 2030
Coordinates: 33.64215, -83.6826
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

Dermody Properties plans a data center campus along East Hightower Trail on the south side of Social Circle, Walton County, Georgia.

  • Land: About 96 acres at 5023, 5073 and 0 E Hightower Trl, zoned Light Industrial. Dermody PL Acquisition Co., LLC applied; the city parcel layer still lists private owners.
  • Plan: Four 250,000 sq ft buildings and a 100,000 sq ft substation beside an existing substation. A 115 kV line crosses the tract.
  • Approvals: Special-use permit SU-2025-008 approved November 18, 2025. Conditions include a 200-foot planted buffer, screened substations and a city utility-capacity letter.
  • Water: Walton County supplies water under a 2025 agreement.
  • Status: Dermody says the end user is under a non-disclosure agreement. No site work was visible in October 2026 imagery.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Dermody: Social Circle 1 Dermody Properties
Planned
— — 2028
Dermody: Social Circle Expansion Dermody Properties
Planned
— — 2029

Map and Nearby Locations

Dermody: Social Circle Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Developer

Developed by:

Reno, Nevada-based industrial real estate investor and developer. Through Dermody PL Acquisition Co., LLC it won approval in 2025 for a four-building data center campus in Social Circle, Georgia.

0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?