Data Center Campus

DC BLOX: Atlanta East Campus(ATL2)

4 sites Atlanta
OperationalUnder ConstructionPlanned
Operational facility with ongoing expansion and future phases planned
Operated by:

Campus at a Glance

4 data centers on this campus
First built in 2025 with expansions through 2030
Coordinates: 33.69129, -84.04499
░░░░ Request Dataset MW
Operational
░░░░ Request Dataset MW
Under Construction
░░░░ Request Dataset MW
Planned

DC Blox, a US data center operator, has started construction on a new data center campus outside Atlanta, Georgia. The company initially announced the project in mid-December 2023, stating that the facility would span 750,000 square feet (69,675 square meters). However, the company later revised the total project size to 1,016,828 square feet (94,466 square meters).

  • The project includes three industrial data center buildings with a combined 1,016,828 SF of space, equipment yards, parking, and substation.
  • A hyperscale client is anchoring the first phase of the project, and 160,000 sq ft (14,865 sqm) of space will be available to additional tenants with expected delivery in Q4 2025.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
DC BLOX: ATL2-A DC BLOX
Operational
░░░░ Request Dataset MW — 2025
DC BLOX: ATL2-B DC BLOX
Under Construction
— — 2027
DC BLOX: ATL2-C DC BLOX
Planned
— — 2028
DC BLOX: ATL2-D DC BLOX
Planned
— — 2030

Map and Nearby Locations

DC BLOX: Atlanta East Campus(ATL2) Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

DC BLOX is a digital infrastructure provider in the Southeastern United States. The company provides colocation, network connectivity and dark fiber services for enterprises and carriers, and operates a cable landing station in South Carolina with a second station planned in Florida.

It is developing hyperscale data center campuses in the Atlanta metro area. In 2025 the company announced additional subsea capacity and secured project financing to advance Atlanta West.

History:

  • 2025-08: Secured a $1.15 billion green loan to develop the Atlanta West data center campus in Douglas County, Georgia.
  • 2025-07: Announced a second subsea cable landing station campus in Palm Coast, Florida, expected to be operational by Q1 2027.
  • 2022-05: Acquired Southeastern fiber assets from Light Source Communications and Ascendant Capital Fiber.
0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?