Data Center Campus

Colocation NorthWest: South Hill Campus

2 sites Seattle
Operational
Fully operational facility
Operated by:

Campus at a Glance

2 data centers on this campus
Coordinates: 47.15486, -122.27902
░░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

There are 2 data centers on the Centeris's 86-acre South Hill campus

  • SH1: 1023 39th Avenue SE, Puyallup, WA 98374
  • SH2: 1015 39th Avenue SE, Puyallup, WA 98374

Power:


  • 50 MW dedicatedonsite substation; expandable in 25 MW increments
  • Dual-fed by two 115kV transmission lines
  • Dual feeds from independent 230 kV utility substations
  • UPS backup (N+1) for full critical load
  • Back-up generators (N+1) for full critical load

Network:


Carrier neutral with Level 3 (North & South), Comcast, CenturyLink, Zayo, Wave and Verizon currently available through diverse and redundant pathways

Access and redundant fiber routes to the Westin, Pittock and other key West Coast Network Access Points and Cable Landing Stations

Building::


  • Located 525 feet above sea level
  • Built on bedrock and constructed to exceed Seismic Zone 3 specifications by 25%
  • SSAE16 Type 1 Audited

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Centeris: SH1 Colocation NorthWest
Operational
░░░░ Request Dataset MW — —
Centeris: SH2 Colocation NorthWest
Operational
— — —

Map and Nearby Locations

Campus Photos

Operating Company

Operated by:

Colocation NorthWest is a division of IsoFusion, a leading provider of Internet access and IT services in the Puget Sound region.

0
Facilities
0
Markets
0MW
Megawatts

Documents

Ready to Level up Your
Data Center Strategy?