Data Center Campus

Ark: Spring Park (Corsham)

Ark Data Centres' Spring Park campus on Westwells Road near Corsham, Wiltshire, is Ark's head office and the base of its Crown Hosting joint venture with the UK government. First built in 2010, with expansions planned through 2029.

OperationalUnder ConstructionPlanned
Operational facility with ongoing expansion and future phases planned
Developed by:

Campus at a Glance

7 data centers on this campus
First built in 2010 with expansions through 2029
Total building size: ░░░░░░░ Request Dataset SqFt
Coordinates: 51.4183, -2.21828
░░░░ Request Dataset MW
Operational
░░░░ Request Dataset MW
Under Construction
░░░░ Request Dataset MW
Planned

Spring Park is Ark Data Centres' founding campus and head office, on Westwells Road at Hawthorn, between Corsham and Neston in Wiltshire. It sits across the road from MOD Corsham, and it has been built up on former industrial land: the higher northern part of the site held a factory building known as SQ2, since demolished, and the lower southern part is the former Hawthorn Works, once home to the plastics moulder Stephens Plastics. In 2026 Ark won consent to extend the campus onto a field south of Westwells Road.

Since 2015 the campus has been the base of Crown Hosting Data Centres, Ark's joint venture with the Cabinet Office, which provides colocation to government departments and other public sector bodies. Ark Estates Spring Park Limited owns the land and Ark Data Centres runs the buildings.

The campus takes its grid supply over 33 kV circuits from the Norrington bulk supply point, arranged as independent resilient systems: two 40 MVA supplies serving the oldest buildings, three 24 MVA supplies into a 48 MVA substation, and SQ19, a 30 MVA substation and generator compound with two further circuits built for the newest phase. Standby power comes from about 70 HVO-fuelled generators under a single Environment Agency permit, including a shared high-voltage generator farm and the SQ19 compound.

Campus History

  • 2026: extension south of Westwells Road approved.
  • 2025: site works began on the sixth building.
  • 2024: Environment Agency permit varied to add 16 generators at SQ19.
  • 2023: SQ19 substation, switch room and generator farm completed.
  • 2015: Crown Hosting joint venture with the Cabinet Office set up at Spring Park.
  • 2010: first data centre on the campus in service.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Ark: Spring Park SQ17 Ark Data Centres (UK)
Operational
░░░ Request Dataset MW — 2010
Ark: Spring Park P1 Ark Data Centres (UK)
Operational
░░░ Request Dataset MW — 2011
Ark: Spring Park P2 Ark Data Centres (UK)
Operational
░░░ Request Dataset MW — 2015
Ark: Spring Park P3 Ark Data Centres (UK)
Operational
░░░ Request Dataset MW ░░░░░░ Request Dataset SqFt 2019
Ark: Spring Park P4 Ark Data Centres (UK)
Operational
░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2021
Ark: Spring Park P5 Ark Data Centres (UK)
Under Construction
— — 2028
Ark: Spring Park P6 Ark Data Centres (UK)
Planned
— — 2029

Map and Nearby Locations

Ark: Spring Park (Corsham) Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Developer

Developed by:
0
Facilities
0
Markets
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.