Data Center Campus
The proposed site for a 2.2 million sqft data center campus on approximately 117 acres.
The proposed campus plan has two three-story buildings with 435,000 sq ft each (40,400 sqm), two three-story buildings with 375,000 sq ft (34,850 sqm) each and two two-story buildings and 268,000 sq ft (24,900 sqm) each. Amazon plans to build two electrical substations on 4.5 and 5 acres.
Amazon acquired nearly 58.5 acres at 5845 Wellington Road in Gainesville for $87.8 million in June 2022, following the acquisition of 58.5 acres at 5945 Wellington Road for $52.4 million in April 2021.
Buildings
| Site | Operator | Status | Operational | Building Size | Built |
|---|---|---|---|---|---|
| GlobalInterested in this information?Contact us | Amazon AWS |
Operational
|
░░░░ Request Dataset MW | 375,000 SqFt | 2025 |
| South HubInterested in this information?Contact us | Amazon AWS |
Operational
|
░░░░ Request Dataset MW | 375,000 SqFt | 2025 |
| Park GammaInterested in this information?Contact us | Amazon AWS |
Under Construction
|
— | — | 2026 |
| Metro CampusInterested in this information?Contact us | Amazon AWS |
Under Construction
|
— | — | 2026 |
| Station PrimeInterested in this information?Contact us | Amazon AWS |
Planned
|
— | — | 2027 |
| Center UltraInterested in this information?Contact us | Amazon AWS |
Planned
|
— | — | 2027 |