Published in Arizona

TSMC signs MoU with Amkor Technology

Oct 09, 2024 | Posted by Abdul-Rahman Oladimeji

Chipmaker TSMC has signed a Memorandum of Understanding (MoU) with US semiconductor product packaging and test services company, Amkor Technology. Following their agreement, Amkor will provide TSMC with turnkey advanced packaging and test services at its planned outsourced semiconductor assembly and test company (OSAT) plant in Peoria, Arizona.

"Amkor is proud to collaborate with TSMC to provide seamless integration of silicon manufacturing and packaging processes through an efficient turnkey advanced packaging and test business model in the United States,” said Giel Rutten, Amkor’s president and CEO. “This expanded partnership underscores our commitment to driving innovation and advancing semiconductor technology while ensuring resilient supply chains."

“Our customers are increasingly depending on advanced packaging technologies for their breakthroughs in advanced mobile applications, artificial intelligence, and high-performance computing, and TSMC is pleased to work side by side with a trusted longtime strategic partner in Amkor to support them with a more diverse manufacturing footprint,” added Dr. Kevin Zhang, TSMC’s SVP of business development and global sales, and deputy joint COO. “We look forward to close collaboration with Amkor at their Peoria facility to maximize the value of our fabs in Phoenix and provide more comprehensive services to our customers in the United States.”

There are 193 data centers in Arizona.

Proposed site for Takanock's Project Baccara in Arizona
Posted in Takanock: Project Baccara Source: Takanock
$10 billion Data Center project planned in Page, Arizona
Posted in Huntley LLC: Page, AZ Source: Google Maps
A 500-acre data center campus is planned in Pinal County.
Posted in W Holdings: Maricopa, AZ Source: Pinal County
Conceptual site plan for Florence Tech Park
Posted in Ryan: Florence Tech Park Source: CVL Consultants
EdgeCore aims to build up to 10 buildings on its part of the Dobson Farms site
Posted in EdgeCore: Dobson Farms Source: EdgeCore
A Digital Representation of Metrobloks PHX-A1 Data Center
Posted in Metrobloks: Phoenix PHX-A1 Source: Metrobloks
Rendering of Metrobloks PHX-A1 Data Center in Phoenix
Posted in Metrobloks: Phoenix PHX-A1 Source: Metrobloks
Arizona Land Consulting acquired 600 acres in Casa Grande
Posted in Arizona Land: Casa Grande Source: Arizona Land Consulting
Aphorio Carter acquired data center in Tucson, Arizona
Posted in Aphorio Carter: Tucson, AZ Source: Cushman & Wakefield
Second Mesa campus planned by NTT with 173 acres land acquisition
Posted in NTT: Pacific Proving Tech Park Source: Google Maps
Sitemap of Ryan Companies' Southwest Crossing Data Center in Eloy, Arizona.
Posted in Ryan Companies: Southwest Crossing Source: Ryan Companies
Site plan for Microsoft's El Mirage campus
Posted in Microsoft: PHX83 Source: Microsoft
Revised Sitemap for Cyrusone Phoenix Campus
Posted in CyrusOne PHX9 Source: CyrusOne
CyrusOne Phoenix Campus Site Plan
Posted in CyrusOne PHX10 Source: CyrusOne
Latest site plan for Novva's Project Borealis in Mesa, Arizona
Posted in Novva: Mesa 2 Source: Novva via Mesa Design Review Board
TECfusions acquired data center in Tucson, Arizona
Posted in TECfusions: Tucson, AZ Source: Cushman & Wakefield
Compass data center sitemap in Goodyear, Arizona
Posted in Compass: Phoenix I DC2 Source: Compass/Goodyear City
Tract acquired site in Buckeye, Arizona
Posted in Tract: Buckeye, Arizona Source: Tract
QTS acquired the planned Hermosa Ranch Tech Campus in Phoenix
Posted in QTS: Hermosa Ranch Source: City of Avondale
Novva Site plan
Posted in Novva: Mesa Campus |
Internap Phoenix Data Center
Posted in Internap Phoenix 2500 W Frye Rd Source: Internap
AZ11 is the first 16-megawatt phase of a 64-MW building scheduled to open next year, with AZ12 and AZ13 being constructed to the north and west
AZ11, a two-story 144,046-sf data center with four data modules
Posted in Vantage Phoenix |
Campus layout for Stack Infrastructure's 5 building campus near Phoenix Sky Harbor International Airport
Posted in STACK Phoenix PHX02 Campus Source: STACK Infrastructure
Aerial view
Posted in Lincoln: Chandler, AZ |
View of the almost completed facility in 2020
Posted in QTS: Phoenix II Campus |
Front Entrance
Posted in US Signal Phoenix AZ01 |
Location Total SqFt Gross SqFt Power (MW)
MDC Nogales NN
Arizona Land: Tonopah Expansion
Real Estate Data Center

Ready to Level up Your
Data Center Strategy?