Published in North Carolina

A $2.24m North Carolina Data Facility Becomes an Eatery And Grocery Store

Apr 27, 2023 | Posted by Abdul-Rahman Oladimeji

Advanced Internet Technologies (AIT) sold its Fayetteville, North Carolina base and data center, with plans to convert the majority of the space.
The 93,000 square foot data center was wholly controlled and run by hosting and service provider AIT since 2004, but was sold to AIT's subsidiary Ace Capital LLC in 2012 following AIT's 2010 loan default. The AIT family has sold the data center to ROI of Houston and Smooth Ruckus LLC of Sheridan, Wyoming for $2.24 million. The facility is situated on 1.62 acres at 421 Maiden Lane in Cumberland County, next to Segra Stadium. According to AIT's founder and proprietor, Clarence Briggs, the data center has been sold because data center equipment has shrunk in size over the years and AIT requires only a tiny portion of the construction, which it will sublet from the new owners.

According to reports, World Class ROI and Smooth Ruckus are investigating the possibility of transforming the building into a restaurant, grocery store, event space, and other amenities. The structure was built in 1937 and inaugurated as a Sears department store. In the 1980s, it became the Cumberland County Department of Social Services, and in the 1990s, it was acquired by AIT, which initially rented the facility.

There are 108 data centers in North Carolina.

Proposed siteplan for Project Delta in Stokes County
Posted in Project Delta Source: Project Delta
Blueprint for Energy Storage Solution’s proposed Kingsboro AI Data Center
Posted in Kingsboro AI data center Source: Energy Storage Solutions LLC
Digital Realty acquired a 1920s office building in Charlotte, North Carolina
Posted in Digital Realty: 725 E. Trade Source: Digital Realty
Conceptual plan for New Hill Digital Campus near Apex
Posted in New Hill Digital Campus Source: Natelli Investments
Proposed site for the Compass Data Centers’ facility in Statesville
Posted in Compass: Statesville, NC |
Conceptual plan for Tract's Mooresville Tech Park in North Carolina
Posted in Tract: Mooresville Tech Park Source: Tract
Nexus Core Systems Charlotte Region Data Center
Posted in Nexus Core: Charlotte Source: Nexus Core Systems
Digital Realty plans two-building data center campus in Charlotte
Posted in Digital Realty: CLT20 Source: Digital Realty
DartPoints Asheville Data Center from outside
Posted in DartPoints: Asheville, NC Source: DartPoints
DartPoints Asheville Data Center in North Carolina
Posted in DartPoints: Asheville, NC Source: DartPoints
Enovum acquires textile plant in North Carolina
Posted in Enovum: Madison, NC Source: Google Maps
Rendering of ImpactData's Greensboro 'dream center'
Posted in ImpactData: Greensboro, NC Source: Raeden
Data Journey acquired The Bed Bath & Beyond data center
Posted in Data Journey: Claremont, NC Source: Google Maps
Rendering of American Tower's RA1 facility
Posted in American Tower: Raleigh, NC Source: American Tower
Harris facility in NC
Posted in GDC Rutherford, NC |
Conover campus site plan
Posted in Microsoft: Lyle Creek Campus |
Aerial view of expansion facility
Posted in Core Scientific: Marble Source: Core Scientific
Aerial rendering of DC Blox High Point data center near Greensboro
Posted in DC BLOX High Point |
Rendering of proposed High Point NC DC BLOX facility
Posted in DC BLOX High Point |
701 East Trade in CLT
Posted in CENTRA: 701 E Trade |
CONE facility at 2223 Northeast Creek Parkway in Durham
Posted in CyrusOne Raleigh-Durham I |
Site Layout in Durham
Posted in CyrusOne Raleigh-Durham I Source: CyrusOne
The WindChill Module design uses fresh air to cool servers, cooling it using an adiabatic cooling system in which air passes through water flowing through evaporative cooling media. The design uses...
WindChill Module
Posted in GIGA Charlotte (Mooresville) Source: GIGA
Ribbon Cutting at the Grand Opening event in June 2019
Posted in GIGA Charlotte (Mooresville) Source: Megan Suggs
Data Center Floor
Posted in Spectrum Charlotte National Data Center |
There are 219,000 linear feet of conduit installed in the facility
Posted in Spectrum Charlotte National Data Center |

Ready to Level up Your
Data Center Strategy?