Education Data CenterInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, El Paso, TX 79902, USA
Operational
Fully operational facility
Operated by: Education OperatorInterested in this information?Contact us

Education Data Center

Short Code: UTEP
Year Built: 2026
░░░ Request Dataset MW
Total Power
░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

The Education OperatorInterested in this information?Contact us is planning to build a new $3 million data center for the College of Education. The facility will be located on the first floor of the Education Building and will cover an area of 4,568 square feet (424.4 square meters). This new center is significantly larger than the existing 1,448-square-foot (134.5 square meters) server room located on the third floor of the El Paso campus, which is situated between the Engineering and Classroom buildings.

Map and Nearby Locations

This Facility ( 3rd Floor & 1st Floor )
Education OperatorInterested in this information?Contact us Sites
Nearby Facilities

Education Data CenterInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Education Data CenterInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Lumen El Paso 2
NN milesInterested in this information?Contact us Lumen El Paso 1
NN milesInterested in this information?Contact us Flō Networks El Paso
NN milesInterested in this information?Contact us North PlazaInterested in this information?Contact us
Sangha Renewables' West Texas data center is operational. The facility is a Bitcoin mining site powered directly by a large-scale solar energy facility located on the same 5.5-acre plot.
NN milesInterested in this information?Contact us South TowerInterested in this information?Contact us
Expansion phase of the OpenAI/Oracle Project Jupiter Stargate campus in Santa Teresa, Doña Ana County, New Mexico, extending on-site gas-powered capacity toward the campus's multi-gigawatt build-out.
NN milesInterested in this information?Contact us Park TwoInterested in this information?Contact us
Building 4 of Phase 1 at OpenAI/Oracle's Project Jupiter Stargate campus, under construction in Santa Teresa, Doña Ana County, New Mexico.
NN milesInterested in this information?Contact us Hub GammaInterested in this information?Contact us
Building 2 of Phase 1 at OpenAI/Oracle's Project Jupiter Stargate campus, under construction in Santa Teresa, Doña Ana County, New Mexico.
NN milesInterested in this information?Contact us AlphaInterested in this information?Contact us
Project Jupiter is a 1,400-acre OpenAI/Oracle Stargate hyperscale data center campus under construction in Santa Teresa, Doña Ana County, New Mexico, near El Paso. Developed by BorderPlex Digital Assets and STACK Infrastructure, leased by Oracle (OCI) with OpenAI as primary client, and powered by on-site natural gas generation.

Operating Company

Operated by: Education OperatorInterested in this information?Contact us
This operator's profile is available on request. Full company details, market presence, portfolio scale, and operating history are available to subscribers with unblurred access. Contact us to unlock the complete operator profile for this facility and every other location in their footprint.Interested in this information?Contact us
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Gradiant To Provide HyperSolved Water Treatment System For West Texas Data Center
Gradiant has partnered with an unnamed hyperscaler to deploy its HyperSolved water treatment system at a West Texas data center. The platform manages the full cooling water cycle, using non-freshwa...

Gradiant To Provide HyperSolved Water Treatment System For West Texas Data Center

September 01, 2026 West Texas

Gradiant has partnered with an unnamed hyperscaler to deploy its HyperSolved water treatment system at a West Texas data center. The platform manages the full cooling water cycle, using non-freshwater sources, high-recovery technology, and AI-powered monitoring to reduce water use, discharge, and...

Read more
Read Bolt Data Partners with TPL to Develop data Center Campuses Across West Texas
Bolt Data Partners with TPL to Develop data Center Campuses Across West Texas

Bolt Data Partners with TPL to Develop data Center Campuses Across West Texas

December 18, 2025 West Texas

Texas Pacific Land Corporation (TPL) has partnered with Bolt Data & Energy to develop data center campuses across TPL-owned land. As part of the deal, Bolt raised $150 million in capital, including $50m from TPL. In return, TPL will receive equity interest, warrants, and a right of first...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?