Carrier-Neutral Data Center

Latest Podcast
3801 46 Ave
Planned
Future facility in planning stage
Operated by:

Synapse: Olds Campus

Year Planned: 2029
Lot Size: 300 acres

Synapse Data Centre Inc. is advancing a $10-billion private-sector project in Olds, Alberta, aimed at establishing one of Canada’s most significant digital infrastructure hubs. Located on a 300-acre site, the proposed 2-million-square-foot campus is designed to support high-density AI workloads and cloud computing.

To ensure operational reliability without straining the provincial electrical grid, the facility will utilize on-site natural gas-fired power generation and a closed-loop water cooling system that requires only a one-time fill.

The project is expected to create 2,000 construction jobs and over 1,000 permanent high-tech roles, with a phased construction timeline targeting initial operations as early as late 2026 and full campus completion within two years.

Map and Nearby Locations:

3801 46 Ave
Synapse Data Center Inc. Sites
Nearby Facilities

Carrier-Neutral Data Center Data Center Photos (See all)

Operating Company

Operated by:
1
Facilities
0
Markets

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?