ServerDomes Global: Hueco Ranch

Latest Podcast US Highway 62/180
PlannedProspective Expansion
Future facility in planning stagefacility with prospective expansion planned
Operated by:

ServerDomes Global: Hueco Ranch

Year Planned: 2028
Utility Provider: Rio Grande Electric Cooperative
Ownership: ServerDomes Global private land. developed by a joint venture of serverdomes global and lonestar kaufman development partners, a kaufman & company affiliate. the building.
Lot Size: 24,000 acres

Site History

  • July 2026: Kaufman & Company announces construction on two geodesic-dome data center campuses, one outside Salt Lake City and one near El Paso.
  • 2026-10-07: Groundbreaking near the Desert Haven community.
  • 2026-10-09: Hudspeth County Judge Joanna MacKenzie confirms the project after a site visit. She says the county was not notified before groundbreaking, and that construction could start as early as 2027.
  • 2026-10-27: Project representatives scheduled to present to the Hudspeth County Commissioners Court.

Project Profile

  • Developers: ServerDomes Global and Lonestar Kaufman Development Partners (Kaufman & Company).
  • Land: About 24,000 acres of private, formerly idle ranch and oil-and-gas land near the U.S.-Mexico border.
  • Design: Geodesic domes with green roofs, cooled by passive convection plus hybrid air, direct liquid, and immersion cooling.
  • Build-out: Phase one has tenants secured, per Kaufman & Company. Up to ten more domes are planned over the next decade.
  • Water: A one-time draw from an on-site well into the aquifer during initial setup, then a closed-loop system fed by roof water catchment.
  • Jobs: About 800 construction jobs over four to five years and 200 to 300 permanent positions.
  • Incentives: The project is not seeking county tax abatements.
  • Investment: About $15 billion.
  • Local context: Texas counties have no zoning authority over private land. Hudspeth County adopted Resolution 2026-013 on data centers in April 2026.

Utility

  • Rio Grande Electric Cooperative serves the Desert Haven area. El Paso Electric's territory ends near the El Paso County line.
  • The area sits on the WECC grid, not ERCOT. Rio Grande Electric Cooperative takes transmission service from El Paso Electric.
  • An El Paso Electric 115 kV line between Coyote and Dell City runs a few miles south of the property. Coyote substation is about 12 miles west.
  • El Paso Natural Gas's Hueco compressor station sits about 10 miles south.

Map and Nearby Locations

US Highway 62/180
ServerDomes Global Sites
Nearby Facilities

ServerDomes Global: Hueco Ranch Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by:

Overview

  • Geodesic-dome data center platform built around passive convection cooling, with no chiller plant.
  • Hybrid air, direct liquid, and immersion cooling supported in the same dome.
  • Domes deploy in 10 to 20 MW increments and scale to multi-dome campuses of 100 MW or more.
  • Behind-the-meter generation is the primary power model.

Partners

  • Kaufman Ventures is an investor.
  • Lonestar Kaufman Development Partners, a Kaufman & Company affiliate, is the joint-venture partner on its Texas and Utah AI infrastructure projects.

Leadership

  • David J Keegan, Group Chief Executive Officer
  • David Jackson, President
  • Ryan Wallace, Managing Director
  • Bradley Blewett, CFO
  • Chris Ward Jones, CTO
  • Neil McRoberts, Head of Commercial
0
Facilities
0
Markets

News See all

Read ServerDomes Global Breaks Ground on 350MW Hueco Ranch Campus Near El Paso
Kaufman & Company and ServerDomes Global broke ground on Oct. 7 on Hueco Ranch, a $15 billion geodesic-dome data center campus near Desert Haven in Hudspeth County, Texas. The campus spans roughly ...

ServerDomes Global Breaks Ground on 350MW Hueco Ranch Campus Near El Paso

October 11, 2026 ServerDomes Global: Hueco Ranch

Kaufman & Company and ServerDomes Global broke ground on Oct. 7 on Hueco Ranch, a $15 billion geodesic-dome data center campus near Desert Haven in Hudspeth County, Texas. The campus spans roughly 24,000 acres and is planned to generate 350 MW, KTSM reported. County officials say no one told...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?