E11: Building India’s Digital Backbone with Sharad Agarwal
Mar 12, 2026 Eric Bell World
Go to PodcastPurpose-built in 2023, the Fortress facility sits in the heart of Grant County’s low-cost hydroelectric zone. Designed for 24×7 blockchain and AI workloads, it uses passive-cooling architecture and dedicated fiber routes to keep temperatures and latency low.
| Distance | Site | About |
|---|---|---|
| NN milesInterested in this information?Contact us | ThreeInterested in this information?Contact us |
The Broadway Data Center was Salcido Enterprises' first site in Grant County, and they expanded it in September 2023.
|
| NN milesInterested in this information?Contact us | Vantage WA12 | |
| NN milesInterested in this information?Contact us | Vantage WA13 | |
| NN milesInterested in this information?Contact us | Vantage WA11 | |
| NN milesInterested in this information?Contact us | Vantage Quincy Campus |
Vantage operates a 68-acre campus with three large data centers.
|
| NN milesInterested in this information?Contact us | Sabey: Intergate.Quincy (Building B) | |
| NN milesInterested in this information?Contact us | Sabey: Intergate.Quincy (Building A) | |
| NN milesInterested in this information?Contact us | Sabey Intergate.Quincy |
Intergate.Quincy is a 525,000 square foot data center five building campus in Central Washington. Like Intergate. Columbia, Intergate.Quincy offers the advantage of low power rates, close proximity to the region’s power grid, and a mild climate ideal for efficient, evaporative cooling.
|
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to Podcast