Operational
Fully operational facility
Operated by:

Salcido Cashmere

░░░ Request Dataset MW
Total Power

Salcido Enterprises converted a portion of a large industrial complex into a multi-megawatt, high-security data processing facility for 24/7 tier-0 cryptocurrency mining and blockchain technology operations in Cashmere, WA. The conversion involved both the design and installation of extensive passive cooling and electrical systems, along with dedicated fiber connectivity, tailored to provide the highest level of efficiency, cost-savings, and safety.

Map and Nearby Locations:

This Facility
Salcido Enterprises Sites
Nearby Facilities

Sites within 15 miles of Metro Point

Distance Site About
0.15 miles Crypto Mining Data Center Request Dataset
The Horizon Data Center underwent a strategic expansion, with the new high-density processing space becoming operational in the 1st quarter of 2019.
7.51 miles Yahoo Japan East Wenatchee
Announced in April 2018, This will be Yahoo Japan’s second infrastructure project on foreign soil, following a 200-rack facility in Washington state in 2014.
9.28 miles Crypto Mining Data Center Request Dataset
This was a successful custom conversion: a cold-storage warehouse was renovated into a Tier-0 data center in Wenatchee, WA.
13.66 miles Hyperscale Data Center Request Dataset
Microsoft Corp. is developing data centers on a 120-acre plot in East Wenatchee. The project, known as EAT06 and EAT09, involves the construction of two linked single-story structures with a combined area of 250,530 square feet.
13.75 miles Hyperscale Data Center Request Dataset
This data center building, valued at $47.1 million, is part of the Microsoft East Wenatchee Campus. The one-story building measures 244,440 square feet and stands 30 feet high. It features 12 restrooms.
13.78 miles Hyperscale Data Center Request Dataset
The project, known as EAT06 and EAT09, involves the construction of two linked single-story structures with a combined area of 250,530 square feet.
14.05 miles Hyperscale Data Center Request Dataset
This data center building, valued at $47.1 million, is part of the Microsoft East Wenatchee Campus. The one-story building measures 244,440 square feet and stands 30 feet high. It features 12 restrooms.
14.07 miles Crypto Mining Data Center Request Dataset
Bitdeer is repurposing its long-standing Wenatchee, Washington facility—originally deployed for crypto mining in 2018—into an AI-ready data center, with the conversion scheduled to finish in Q4 2026.
14.10 miles Hyperscale Data Center Request Dataset
Microsoft acquired a 170-acre plot in East Wenatchee in 2020 with plans to build six facilities in the Pangborn area.
14.23 miles Hyperscale Data Center Request Dataset
This data center building, valued at $55.2 million, is part of the Microsoft East Wenatchee Campus. The one-story building measures 237,337 square feet and stands 30 feet high with 12 restrooms.
14.69 miles Crypto Mining Data Center Request Dataset
Salcido is a Cyrpto Mining hosting provider. Salcido calls it a "Tier 0" data center apparently in reference to the redundancy design
15.18 miles Sabey Intergate.Columbia
The Intergate.Columbia campus in East Wenatchee sits on 30 acres of land. The campus is fully leased, but Sabey is expanding on the campus.
15.24 miles T-Mobile East Wenatchee
T-Mobile's data center is on Sabey's campus.
16.13 miles Crypto Mining Data Center Request Dataset
Successfully deployed in July of 2023, this modern data space in Chelan County, WA, underwent a full refurbishment.
18.18 miles Hyperscale Data Center Request Dataset
Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. The development will construct the first building on the site by the end of 2025, with potential for two more buildings by 2027.
18.23 miles Hyperscale Data Center Request Dataset
Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. The development will construct the first building on the site by the end of 2025, with potential for two more buildings by 2027.
18.29 miles Hyperscale Data Center Request Dataset
Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. Microsoft acquired more than 100 acres in a deal spread across two phases; Phase I is the Lojo Property, 72.5 acres at 5375 Malaga Alcoa Highway for which Microsoft paid $6.6 million.

Central Center Data Center Photos (See all)

Operating Company

Operated by:

Salcido Enterprises, LLC builds and manages data spaces. It also operates data centers in Cashmere, Columbia, and Douglas County, Washington. The company was incorporated in 2015 and is based in Wenatchee, Washington.