░░░ Contact Us to subscribe to our data service MW Total Power
Show SqMOperated by: Salcido Enterprises
Salcido Enterprises converted a portion of a large industrial complex into a multi-megawatt, high-security data processing facility for 24/7 tier-0 cryptocurrency mining and blockchain technology operations in Cashmere, WA. The conversion involved both the design and installation of extensive passive cooling and electrical systems, along with dedicated fiber connectivity, tailored to provide the highest level of efficiency, cost-savings, and safety.
Distance | Site | About |
---|---|---|
7.51 miles | Yahoo Japan East Wenatchee |
Announced in April 2018, This will be Yahoo Japan’s second infrastructure project on foreign soil, following a 200-rack facility in Washington state in 2014.
|
13.83 miles | Microsoft East Wenatchee | |
14.45 miles | BitDeer: Washington | |
14.69 miles | Salcido Pangborn Data Center |
Salcido is a Cyrpto Mining hosting provider. Salcido calls it a "Tier 0" data center apparently in reference to the redundancy design
|
15.18 miles | Sabey Intergate.Columbia |
The Intergate.Columbia campus in East Wenatchee sits on 30 acres of land. The campus is fully leased, but Sabey is expanding on the campus.
|
15.24 miles | T-Mobile East Wenatchee |
T-Mobile's data center is on Sabey's campus.
|
18.08 miles | Microsoft: Malaga 3 |
Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. The development will construct the first building on the site by the end of 2025, with potential for two more buildings by 2027.
|
18.19 miles | Microsoft: Malaga 2 |
Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. The development will construct the first building on the site by the end of 2025, with potential for two more buildings by 2027.
|
18.34 miles | MIcrosoft: Malaga, WA |
Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. Microsoft acquired more than 100 acres in a deal spread across two phases; Phase I is the Lojo Property, 72.5 acres at 5375 Malaga Alcoa Highway for which Microsoft paid $6.6 million.
|
Salcido Enterprises, LLC builds and manages data spaces. It also operates data centers in Cashmere, Columbia, and Douglas County, Washington. The company was incorporated in 2015 and is based in Wenatchee, Washington.