Pirkanmaa Data Center Market

Latest Podcast
Pirkanmaa, centered on Tampere, Finland's second-largest urban area, has a small colocation market and a fast-growing pipeline of campus projects. Developers target land near Fingrid's 400 kV grid east and south of the city. New transmission lines set the pace. Read More

Market Facts

Pirkanmaa Data Center Map

Pirkanmaa Power Growth Over Time

+400% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Pirkanmaa

E-Heat
Site
Power
Operational
1
2.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
GleSYS
Site
Power
Operational
1
0.5
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Elisa Corporation
Site
Power
Operational
1
0.5
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Fortum
Site
Power
Operational
0
0.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
1
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
0
View Provider

Largest Data Centers in Pirkanmaa

Location About Total SqFt Power (MW)
GleSYS: Tampere (The Deck)
Verne acquired its Tampere data center in 2022 as part of the Ficolo acquisition.
NN Request Dataset
FCDC: Akaa
FCDC is developing a data center complex of about 44,000 m² in the Akaa Point business area in Akaa.
Fortum: Valkeakoski (Pispantalli)
Fortum is developing a data center area of about 60 hectares at Pispantalli, northwest of central...
Polarnode: Nokia
In April 2025, Finnish developer Polarnode reached a land lease agreement with the City of Nokia ...
Polarnode: Kangasala (Taraste)
Polarnode is developing a data center in the Tarastenjärvi circular-economy area of Kangasala, be...

About This Metro

Overview

Pirkanmaa is the region around Tampere, Finland's second-largest urban area and a center for technology and manufacturing. Its operating data centers are small, network-dense sites in central Tampere. Since 2025, developers have proposed large campuses in the surrounding towns of Kangasala, Nokia, Akaa and Valkeakoski. The region is one of the newest growth markets in Finland.

History

Tampere's commercial data centers grew out of its telecom and engineering base. Ficolo opened its Tampere facility, The Deck, beside the railway station in 2011. Digital 9 Infrastructure bought Ficolo in 2022 and later folded it into Verne. In October 2025 GleSYS agreed to take over Verne's Finnish operations, including Tampere. It completed the integration in February 2026.

The TREX Tampere internet exchange links local operators at a few central buildings. One of them is Elisa's Nalkala exchange.

Large-campus interest arrived in 2025 and 2026. Polarnode planned a campus in Nokia, then moved the project to a new plot at Kyynijärvi in 2026. Its Kangasala project at Taraste won a legally valid building permit in August 2026. FCDC received a building permit in Akaa in September 2026. The same month Fortum started an environmental impact assessment for a campus at Pispantalli in Valkeakoski.

The Market Today

Colocation in Pirkanmaa remains small and centered on Tampere. GleSYS runs The Deck, a modular facility in the city center near the railway station. Elisa's Nalkala exchange hosts the TREX Tampere peering point. A downtown office building on Hallituskatu houses the densest cluster of networks.

The new pipeline sits outside the city, near the 400 kV grid. Polarnode plans its own 400 kV line from Fingrid's Kangasala substation to the Taraste site. UM Kiinteistöt markets DataPark Kangasala to operators and has applied for permits. Fortum plans two 400 kV lines from its Valkeakoski site to Fingrid's Lavianvuori substation. In Valkeakoski, E-Heat also runs a small container data center that feeds district heat.

Advantages

  • Large urban market. Tampere offers a deep technical workforce, two universities and the country's second-biggest business base.
  • 400 kV grid. Fingrid substations at Kangasala and Lavianvuori anchor several campus plans.
  • Central location. The region sits on the main rail and road links between Helsinki and northern Finland.
  • Network density. TREX Tampere and the main Finnish carriers meet in central Tampere.
  • Heat demand. Tampere and nearby towns run district heating networks that can use recovered heat.

Challenges

  • Grid queue. Fingrid reports very strong demand for new connections, and most campuses here need new 400 kV lines first.
  • Early-stage pipeline. Most campus projects still await zoning, environmental review or a grid connection.
  • Small colocation base. Tampere has little wholesale capacity, so new demand waits on campus builds.
  • Plot changes. Projects have already moved sites, as Polarnode did in Nokia in 2026.

Trends

  • From city to campus. Developers are moving from central Tampere buildings to large plots near the 400 kV grid.
  • Utility-led development. Fortum now develops data center land itself and seeks a developer to invest.
  • Consolidation. GleSYS's takeover of Verne's Finnish sites put Tampere and Pori under one Nordic operator.

Power and Policy

Fingrid, the national transmission system operator, connects large data centers at 110 kV or 400 kV. Several Pirkanmaa projects plan their own 400 kV lines to Fingrid substations. In 2026 the Permit and Supervision Agency (LVV) ruled that one such Kangasala line needed no environmental impact assessment. Municipalities control zoning and building permits, and Kangasala and Akaa have both granted data center permits. The Energy Authority regulates the network companies that serve smaller loads.

Related News See all

Read Elisa Targets Data Center Growth as Finland’s Market Expands
Elisa CEO Topi Manner has highlighted the data center market as a key long-term growth opportunity for the telecom company. Speaking during Elisa’s Q2 earnings call, Manner said the quarter marked ...

Elisa Targets Data Center Growth as Finland’s Market Expands

July 18, 2026 Elisa Corporation

Elisa CEO Topi Manner has highlighted the data center market as a key long-term growth opportunity for the telecom company. Speaking during Elisa’s Q2 earnings call, Manner said the quarter marked the start of the company’s large-scale data center connectivity business, amid Finland’s ongoing...

Read more
Read Elisa to share heat from its data center in Helsinki
Elisa to share heat from its data center in Helsinki

Elisa to share heat from its data center in Helsinki

August 15, 2022 Elisa Corporation

According to reports, Finish telco Elisa is the latest company to employ circular economy principles in order to make use of waste heat from its data center in Helsinki. The company recently announced that it has connected to an open district heating system run by energy company Helen, to help...

Read more
Read Ficolo acquires Cybercom data center in Tampere
Baxtel

Ficolo acquires Cybercom data center in Tampere

August 29, 2018 GleSYS: Tampere (The Deck)

Ficolo has acquired Cybercom’s data center business in Tampere. Cybercom’s data centers will be transferred to Ficolo and additionally Cybercom outsources data center operations services to Ficolo. The transfer takes place on August 31st, 2018 and does not impact Cybercom’s data center customers....

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.