NJFX New Jersey Fiber Exchange

Latest Podcast 1410 Wall Church Rd.
Under ConstructionLand BankOperational
Fully operational facility with expansion in progress and additional land secured
Operated by:

NJFX New Jersey Fiber Exchange

Site was first built in 2016 and has expansions through 2028
PUE: 1.35
Utility Provider: JCPL: New Jersey Central Power And Light
░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

Building:


  • Two-story, 64,800 sq. ft. facility
  • 1,000 cabinet capacity
  • Independent Tier 3 and MEP/FP -designed neutral network hub
  • Located on Tata Communications’ international CLS
  • Carrier-neutral MMR
  • 24/7 on-site security
  • Secure loading dock access
  • Hurricane 5-resistant Infrastructure
  • Gated property with 24 hr surveillance and guards
  • 60 route miles away from NYC and outside blast zone

Power:


  • N+1 UPS with configurable distribution for up to 20kW/cabinet loads
  • N+1 indoor generators with on-site fuel for ve days
  • Annual PUE of 1.35 with Evaporative roof top cooling solution and back up water tanks

Subsea Cable Landings:

As a CLS data center, NJFX offers direct access to the TGN 1 & 2, Seaborn, HAVFRUE/AEC2 (2019) and Wall-LI (2020) subsea cable systems.

Map and Nearby Locations

1410 Wall Church Rd.
NJFX Sites
Nearby Facilities

NJFX New Jersey Fiber Exchange Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of NJFX New Jersey Fiber Exchange

Distance Site About
0.11 miles Tata Wall, New Jersey

NJFX New Jersey Fiber Exchange Data Center Photos See all

Exterior of the NJFX Facility
Source: NJFX

Operating Company

Operated by:

NJFX owns and operates a 64,800 square foot purpose-built Tier 3 Cable Landing Station (CLS) Colocation facility and 58-acre campus in Wall, NJ

1
Facilities
1
Markets
10MW
Megawatts

News See all

Read New Jersey Lawmakers Approve Bill Creating Large Load Data Center Tariff
New Jersey lawmakers have passed a bill directing the state’s Board of Public Utilities to create a dedicated tariff for data centers with capacities of 50MW or more, aimed at protecting other rate...

New Jersey Lawmakers Approve Bill Creating Large Load Data Center Tariff

July 03, 2026 New Jersey

New Jersey lawmakers have passed a bill directing the state’s Board of Public Utilities to create a dedicated tariff for data centers with capacities of 50MW or more, aimed at protecting other ratepayers from rising costs linked to new developments. The legislation, S731, replaces an earlier...

Read more
Read Local Officials Reject Proposed Data Center in New Brunswick, New Jersey
Local Officials Reject Proposed Data Center in New Brunswick, New Jersey

Local Officials Reject Proposed Data Center in New Brunswick, New Jersey

February 21, 2026 New Jersey

Local authorities in New Brunswick, New Jersey, voted on Wednesday against allowing the construction of a data center on a plot of land slated for redevelopment, instead requiring that a park be built on the site. The New Brunswick City Council was reviewing a proposal for the Jersey-Sandford...

Read more
Read New Jersey Senate Advances Bill to Establish New Rate Class for Data Centers
New Jersey Senate Advances Bill to Establish New Rate Class for Data Centers

New Jersey Senate Advances Bill to Establish New Rate Class for Data Centers

January 13, 2026 New Jersey

The New Jersey Senate has advanced a bill that would create new tariff classes for “large load” data centers in an effort to protect ratepayers in the state from cost increases.The bill, cosponsored by ten Democrat lawmakers, would require public electrical utilities in the state to submit...

Read more
Read Stack Overflow Fully Exits Data Centers
Stack Overflow Fully Exits Data Centers

Stack Overflow Fully Exits Data Centers

January 06, 2026 New Jersey

Stack Overflow, a question-and-answer website for computer programmers, has officially exited its data center in New Jersey as part of its cloud migration effort. Stack noted that for the past 16 years it had been operating out of a physical data center in which the site reliability engineer...

Read more
Read NJFX Plans 10MW Liquid-cooled Data Hall in New Jersey
NJFX Plans 10MW Liquid-cooled Data Hall in New Jersey

NJFX Plans 10MW Liquid-cooled Data Hall in New Jersey

December 01, 2025 New Jersey

NJFX is expanding its cable landing station and data center site in New Jersey. The firm said the move is supported by the execution of an electric utility load letter supported by a $3 million deposit, targeting power delivery by end of 2026. Bala Consulting Engineers is working with the company...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?