Lumen Cleveland (4000 Chester)

4000 Chester Avenue

░░░░░ Login to view SqFt Gross Colocation Size

░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

Power:

  • Utility: The Illuminating Company
  • Power densities: 125 watts/square foot
  • AC and DC power options available
  • Critical Power Capacity: Up to 600 kilowatts of critical load capability, isolated 2N UPS configuration delivered through independent 1600 amp buses. All UPSs are double conversion units in 2N architecture providing separated and isolated A and B power paths to critical loads
  • UPS Energy Storage: Battery energy storage system
  • Emergency Power: One 1MW diesel generator with stand-by generator connection for second generator. Unit housed in enclosure for protection with physical separation between unit and switchgear
  • Fuel Storage: 36-plus hours of fuel in 2,000-gallon main fuel tank. Onsite refueling capable while running

Location:

  • Campus: Two-story building
  • Parking: 25-plus stalls
  • Shipping: Street-level loading dock
  • Access: Facility accessible to customers 24/7
  • Flood Plain: Outside 100-year flood plain
  • Seismic: Meets 1997 UBC Zone 1 standards
  • Nearest Airport: Cleveland Hopkins International
  • Storage: Secure storage room available for customer use

Map and Nearby Locations:

4000 Chester Avenue
Click Map to begin Search

Sites within 15 miles of Lumen Cleveland (4000 Chester)

Show SqM
Distance Site About
1.19 miles Lumen Cleveland 4
Located within the Keith Building
1.19 miles Cogent: 1621 Euclid
1.20 miles Fusion Connect Cleveland
1.31 miles H5 Cleveland Technology Center (CTC)
In January 2017, H5 acquired the building from ByteGrid
1.36 miles DataBank Cleveland CLE1
The "Sterling Building" in Cleveland's Theater District is a tech-focused office building, the structure dates from 1909 and once was the home of the old Sterling Lindner department store.
1.36 miles XO: 1525 Rockwell
1.36 miles SecureData 365 Cleveland
The site was opened in 2015 and is within H5's data center building.
1.37 miles DataBank Cleveland
Formerly known as zColo Cleveland-1525 Rockwell
6.74 miles Lumen Cleveland 5
6.80 miles Expedient Garfield Heights 2
6.86 miles Expedient Garfield Heights 1
8.63 miles T5@Cleveland
10.02 miles Involta Independence
15.11 miles Cleveland Clinic Brecksville
The Cleveland Clinic built it's own data center in Brecksville, Ohio. The 14 acre plot of land was acquired in 2010. The facility was completed in 2012.

Lumen Cleveland (4000 Chester) Data Center Photos


Satellite View of 4000 Chester
Source: Google Maps

Operating Company

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
281 Facilities Owned
121 Markets Served
93.8 Megawatts
View Company

News

Read More News

Files

Name Date Added Description
cleveland-oh-data-center September 2020

4000 Chester Data Sheet (PDF)