LEDC: Albury

Latest Podcast
17 Avalon St
OperationalPlanned
Operational with future phases planned
Operated by:

LEDC: Albury

Short Code: ABX1
Year Built: 2023
PUE: 1.38
Utility Provider: Essential Energy
░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power
░░░░░ Login to view SqFt
Gross Colocation Size

Power


  • N+1 redundancy of supply power
  • 2N rack power supply (A & B) as standard
  • Redundant 1000kVA diesel generators
  • Uninterrupted Power Supply (UPS)
  • Isolated parallel bus
  • 375kw IT load capacity per module

Network

  • N+1 resilient network infrastructure
  • 99.95% network availability SLA
  • Dark fibre to the Albury NBN POI
  • Cloud on ramps to public cloud providers
  • Layer 2 ports from 100Mbps to 100Gbps
  • Internet/Transit up to 100Gbps

Map and Nearby Locations:

17 Avalon St
Leading Edge Data Centres Sites
Nearby Facilities

Sites within 15 miles of LEDC: Albury

Distance Site About
2.38 miles EC5 Albury

LEDC: Albury Data Center Photos (See all)

Operating Company

Operated by:
7
Facilities
0
Markets
4MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?