Innava Albuquerque

Latest Podcast 5201 Hawking Dr. SE
Operational
Fully operational facility
Operated by: Innava

Innava Albuquerque

Year Built: 2009
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size
  • The first phase, which came online in mid 2015, has 6,000sqft of data center space. The 130,000sqft building has the potential to accommodate 80,000sqft and 8 MW at full build-out.
  • Building was constructed in 2009
  • 30+ acres for future development
  • 100,000+ sq. ft. of concrete floor available
  • Biometric Access
  • Low cost of power
  • Environmentally safe geographic area
  • Ambient air cooling 85% of year

Map and Nearby Locations

5201 Hawking Dr. SE
Innava Sites
Nearby Facilities

Innava Albuquerque Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Innava Albuquerque

Distance Site
6.19 miles Centersquare: Albuquerque ABQ1
6.33 miles H5 Albuquerque
9.31 miles Connect Data Centers: Albuquerque, NM
9.72 miles UPN Albuquerque
15.14 miles PlusInterested in this information?Contact us
15.21 miles CloudInterested in this information?Contact us
15.33 miles Global ParkInterested in this information?Contact us
15.39 miles Plaza TwoInterested in this information?Contact us
15.46 miles Center TwoInterested in this information?Contact us
15.47 miles East CenterInterested in this information?Contact us
15.52 miles UltraInterested in this information?Contact us
15.60 miles EdgeInterested in this information?Contact us
15.62 miles RidgeInterested in this information?Contact us
15.74 miles Global CampusInterested in this information?Contact us

Operating Company

Operated by: Innava
0
Facilities
0
Markets
0MW
Megawatts

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.