E11: Building India’s Digital Backbone with Sharad Agarwal
Mar 12, 2026 Eric Bell World
Go to PodcastInfraKey is planning a data center campus on the Hyderabad IT Corridor in Telangana. A state MoU was signed in December 2025, the site was selected in 2025, and land and a renewable power contract are still being worked in 2026, with construction slated for early 2027 and first delivery in 2028.
The published scheme is 150 acres, Tier III-equivalent and designed for high-density GPU and HPC loads.
| Distance | Site | About |
|---|---|---|
| 0.45 miles | Reliance: Hyderabad |
Reliance operates a data center in Hyderabad, Telangana.
|
| 1.03 miles | CtrlS: Hyderabad DC1 |
This facility houses 1,152 racks and occupies an area of 191,749 square feet.
|
| 1.16 miles | CapitaLand: HYD01 |
CapitaLand Investment Limited (CLI) HYD01 data center, located in the International Tech Park Hyderabad (ITPH), spans a total floor space of 300,000 sq ft (27,870 sqm).
|
| 1.21 miles | STT Hyderabad 1 | |
| 2.28 miles | CtrlS: Hyderabad DC3 |
Located in Seismic Zone 2, CtrlS Hyderabad DC3 shields enterprise operations from natural disasters. This facility houses 3500 racks and occupies an area of 130,000 square feet.
|
| 2.65 miles | Iron Mountain: Hyderabad |
Located in the Kondapur region of Hyderabad, the Tier III quality HYD-1 data center spans 120,000 square feet (11,100 sqm).
|
| 2.74 miles | Redcentric India Hyderabad | |
| 3.86 miles | Sify: Hyderabad 1 |
Sify's first data center in Hyderabad has capacity for 2,400 racks.
|
| 3.87 miles | CtrlS: Hyderabad DC2 |
In 2020, CtrlS launched the second Rated-4 data center facility in Hyderabad. This facility houses 720 racks and occupies an area of 82,262 square feet.
|
| 6.82 miles | NICSI: Hyderabad |
The National Data Centre in Hyderabad, is a Tier-III facility with a capacity of 154 racks.
|
| 8.66 miles | RailTel: Secunderabad DC | |
| 8.72 miles | Princeton PDG HY1 |
Princeton Digital Group has secured land for its first data center campus in Hyderabad, Telangana (HY1), marking its entry into the market. The project is in the early development stage, with land and power approvals in place as of March 2026.
|
| 12.79 miles | UPC Volt: Telangana |
UPC Volt, a joint venture between Netherlands-based UPC Renewables and Volt Data Centres, is set to establish a high-performance AI-ready data center in Telangana’s Bharat Future City.
|
| 19.44 miles | Sify: Hyderabad 2 Campus |
Sify’s Hyderabad 02 data center campus in Fab City is designed for up to 250+ MW IT capacity.
|
| 19.45 miles | Nxtra: Hyderabad I |
Nxtra by Airtel is building a massive data center campus in Hyderabad, India, situated on a 40-acre plot.
|
| 19.60 miles | Park ProInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 19.66 miles | PlazaInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 19.80 miles | CampusInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 19.83 miles | Hub PrimeInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 19.98 miles | East RidgeInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
Infrakey DC Parks develops, finances, and operates next-generation hyperscale and AI-ready data center parks engineered around integrated multi-utility infrastructure.
The company's mission is to deliver sovereign-grade, utility-rich digital districts that allow hyperscalers, AI platforms, and enterprise operators to scale with reliability, resiliency, and speed-to-market.
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to PodcastTell us what you're looking for. We respond within one business day.