Hut 8: Drumheller, Alberta

Latest Podcast Township Road 294
Operational
Fully operational facility
Operated by:

Hut 8: Drumheller, Alberta

Year Built: 2018
Utility Provider: ATCO Electric
Ownership: Hut 8 Corp leases the land. the building.
░░░░ Request Dataset MW
Operational Power

Site History

  • 2017: Bitfury leases land on Drumheller's North Hill and installs containerized bitcoin miners.
  • 2018: Hut 8 adds 12 more BlockBox mining containers.
  • March 2024: Hut 8 shuts the site, citing high energy costs and voltage issues, and keeps the lease.
  • March 2026: Hut 8 re-energizes the site for about 11,300 American Bitcoin miners.

Project Profile

  • Operator: Hut 8
  • Tenant: American Bitcoin (a Hut 8 subsidiary)
  • Location: Starland County, north of Drumheller
  • Status: Operational

Map and Nearby Locations

Township Road 294 ( SE 27-29-20-W4M )
Hut 8 Corp Sites
Nearby Facilities

Hut 8: Drumheller, Alberta Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by:

Hut 8 is one of North America's oldest, largest and most innovative digital asset miners in the world. Hut has one of the highest installed capacity rates in the industry and is the largest holder of self-mined Bitcoin of publicly traded companies globally.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read FingerMotion, Genius Group Sign JV For 2.4MW HPC Campus In Alberta
Genius Group, [FingerMotion](https://baxtel.com/data-centers/fingermotion) and BlueFlare Energy Solutions signed [binding agreements](https://ir.geniusgroup.net/news-events/press-releases/detail/26...

FingerMotion, Genius Group Sign JV For 2.4MW HPC Campus In Alberta

October 28, 2026 FingerMotion

Genius Group, FingerMotion and BlueFlare Energy Solutions signed binding agreements on October 27 to form GENIUSpark Alberta Inc. and build high-performance computing campuses in Alberta, Canada. The first site, Hanna Campus No. 1, carries an estimated $24.3 million cost and 2.4 MW of computing...

Read more
Read Avax One Targets 10MW Behind-the-Meter Data Center in Alberta
Avax One Targets 10MW Behind-the-Meter Data Center in Alberta

Avax One Targets 10MW Behind-the-Meter Data Center in Alberta

April 11, 2026 Alberta

Cryptocurrency firm Avax One Technology has signed a front-end engineering and design (FEED) proposal for a 10MW off-grid, natural gas-powered AI and high-performance computing (HPC) data center at the 4-31 Battery site in Alberta, Canada. The FEED study will be led by BlueFlare Energy Solutions...

Read more
Read Hut 8 Announces Four Data Center Projects across US
Hut 8 Announces Four Data Center Projects across US

Hut 8 Announces Four Data Center Projects across US

August 28, 2025 Hut 8 Corp

HPC and cryptomine data center developer Hut 8 this week announced plans to develop four new sites across the United States, totaling 1.53GW of capacity under development. The expansion sites range in scale from 50MW to 1GW of utility capacity across Louisiana, Texas, and Illinois. Hut 8 said it...

Read more
Read Hut 8 Awarded Five-Year Capacity Contract for 310MW of Natural Gas Power in Ontario
Hut 8 Awarded Five-Year Capacity Contract for 310MW of Natural Gas Power in Ontario

Hut 8 Awarded Five-Year Capacity Contract for 310MW of Natural Gas Power in Ontario

July 03, 2025 Hut 8 Corp

Cryptomining and HPC firm Hut 8 has been awarded a five-year capacity contract with the Ontario Independent Electricity System Operator (IESO) for 310MW of natural gas generation assets. The portfolio is owned and operated by Far North Power Corp, a partnership between Hut 8 and Macquarie...

Read more
Read Hut 8 Launches Cryptomine Data Center in Texas
Hut 8 Launches Cryptomine Data Center in Texas

Hut 8 Launches Cryptomine Data Center in Texas

July 02, 2025 Hut 8 Corp

Cryptomining and HPC data center firm Hut 8 Corp. has launched a Bitcoin mining data center in Texas which spans 162,000 sq ft (15,050 sqm) and will offer 205MW of capacity at full energization. Vega features a proprietary, rack-based, direct-to-chip liquid cooling system designed in-house by Hut...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?