GTR: Tel Aviv IS One

Latest Podcast Location withheld
Operational
Fully operational facility
Operated by:

GTR: Tel Aviv IS One

Short Code: IS One
Year Built: 2023
PUE: 1.17
░░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size
  • 4,800 sq m of technical space
  • Located in Israel’s premier data hub, Petah Tikva
  • N+1 Tier III infrastructure
  • PUE <1.17
  • Designed & built to hyperscale specifications

Map and Nearby Locations

Location withheld
Global Technical Realty Sites
Nearby Facilities

GTR: Tel Aviv IS One Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of GTR: Tel Aviv IS One

Distance Site About
0.53 miles MedOne: Petach Tikva Campus
Designed for hyperscale and enterprise customers, MedOne's Petach Tikval campus is a state-of-the-art, standalone, underground data center.
0.79 miles EdgeConneX: Petah Tikva
This facility was acquired by EdgeConneX as part of its 2021 acquisition of Global Data Center (GDC), an Israel-based data centre operator.
4.41 miles Serverfarm Israel ISR3
5.08 miles EdgeConneX: Herzliya
This facility was acquired by EdgeConneX as part of its 2021 acquisition of Global Data Center (GDC), an Israel-based data centre operator.
7.91 miles EdgeConneX: Neve Yamin
EdgeConneX acquired land in the Neve Yamin Industrial Area in 2023, with plans to develop its fourth Israeli data centre on the site.
8.55 miles Edge ValleyInterested in this information?Contact us
9.40 miles EdgeConneX: Rishon LeTsiyon
EdgeConneX's third data centre in Israel is located in south Tel Aviv.
10.22 miles Project Omega
Ned Data Centers, backed by Goldacre and the Levinstein Group, has acquired land near Rishon Le Zion, south of Tel Aviv.
11.96 miles MedOne: RM3
This facility is part of MedOne's Ramla Campus in Israel.
12.02 miles MedOne: RM2
This facility is part of MedOne's Ramla Campus in Israel.
12.10 miles MedOne: Ramla Campus
Designed for hyperscale and colocation customers, MedOne's Ramla campus is a state-of-the-art, standalone, underground data center.
12.75 miles NED: Alpha 1
Project ALPHA is a highly advanced data center campus located in Netanya, just 20 km north of the Tel Aviv CBD, it will serve as a hub for numerous local and global high-tech companies, major R&D along with employment hubs.
12.80 miles NED: Alpha 2
This data center building will be part of Project Alpha in Netanya, Israel, developed by Israeli-based data center owner-operator NED Data Centers.
15.49 miles MedOne: KY2
KY2 facility is part of MedOne's Kfar Yona Campus in Israel.
15.54 miles MedOne: Kfar Yona Campus
Israeli data center company MedOne is developing two new underground data centers outside Tel-Aviv in Kfar Yona. The facilities will be spread over three underground floors in an area of approximately 30,000 sqm (322,920 sq ft).
15.83 miles East PlazaInterested in this information?Contact us

GTR: Tel Aviv IS One Data Center Photos See all

Operating Company

Operated by:
5
Facilities
4
Markets
51MW
Megawatts

News See all

Read KKR’s Global Technical Realty moves ahead with UK data center
KKR’s Global Technical Realty moves ahead with UK data center

KKR’s Global Technical Realty moves ahead with UK data center

January 17, 2022 Global Technical Realty

KKR's Global Technical Realty has announced that it has begun work on its UK data center campus located in Slough. When fully built out, the campus will have a total capacity of 40.5MW, made up of three 13.5MW, 5,400 sq m (58,000 sq ft) data centers. Franek Sodzawiczny, Founder and CEO at Global...

Read more
Read GTR to build new data center in Tel Aviv
GTR to build new data center in Tel Aviv

GTR to build new data center in Tel Aviv

August 11, 2021 Global Technical Realty

Global Technical Realty (GTR) has announced that it is launching a 10.5MW data center in Petah Tikva, Israel. The facility will be an underground site that will be built for hyperscale purposes. It will also have 4,800 sqm (51,666 square feet) of space spread across two floors. Each of the floors...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?