NE Edge purchases a parcel of land in Connecticut
August 24, 2023
Connecticut
Gray Wolf's Amston 2 facility will leverage behind-the-meter power, operating independently of the electrical grid. This will be achieved through on-site natural gas-powered solid oxide fuel cells or linear generators, for which the necessary state regulatory approvals have already been secured.
These sustainable technologies are designed to transition to biofuel, renewable natural gas, or hydrogen when available, though such fuels are not currently accessible in Connecticut. Classified as Class 1 Renewable, this approach will address the region’s constrained grid, with no plans for grid connection upon completion.
| Distance | Site | About |
|---|---|---|
| 0.04 miles | Gray Wolf: Amston 1 |
Gray Wolf's Amston 1 Data Center will leverage behind-the-meter power, operating independently of the electrical grid.
|
| 19.96 miles | Lumen Hartford 1 |
Gray Wolf Data Centers is revolutionizing the future of technology with purpose-built, high-density data centers strategically located in secondary U.S. cities.
Empowering innovation through scalable, energy-efficient, and secure edge data centers, enabling businesses to thrive in AI, blockchain, and decentralized technologies.
August 24, 2023
Connecticut
June 27, 2023
Connecticut
February 23, 2023
Connecticut
June 26, 2022
Connecticut
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas