Faster CZ built its first Brno data center building in 2013 for the purpose, with one hall for 129 racks. A second building next to it, linked by an internal corridor, opened in 2019 with six smaller halls and lockable private rooms of up to 16 racks, and brought capacity to 222 racks. Two substations feed the site, one of them on Faster's own land, and two diesel generators back it up. The cooling plant reuses server heat to warm the building and its hot water and sends only the surplus to outdoor coolers. Three separate fiber routes enter the site. O2 Czech Republic also sells housing from space in the building.
Site History
- In October 2019, Faster CZ opened the second building, with six halls and 96 racks of initial capacity.
- In 2013, Faster CZ completed the first data center building, with one hall of 129 racks.