Templus: Sevilla SEV01

Latest Podcast Av. de Montes Sierra 48-B
Operational
Fully operational facility
Operated by:

Templus: Sevilla SEV01

Year Built: 2001
Utility Provider: e-distribución
░░░ Request Dataset MW
Operational Power
░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Templus SEV01 is a carrier-neutral data centre in the Montes Sierra industrial estate in Seville. It opened in 2001 and later ran as Itconic Sevilla and Equinix SA1. Equinix sold it in 2023, and Templus bought it from Espacio Rack in March 2025 and relaunched it.

Site History

  • Mar 2025: Templus bought the facility from Espacio Rack.
  • Q3 2023: Equinix divested SA1.
  • Oct 2017: Equinix closed its acquisition of Itconic.
  • 2001: The data centre opened.

Project Profile

  • 370 m² of IT space, Tier III Ready design, renovated in 2021.
  • Rooftop solar and more than 10 carriers.

Map and Nearby Locations

Av. de Montes Sierra 48-B ( Edificio Montes Sierra 36-48 )
Templus Sites
Nearby Facilities

Templus: Sevilla SEV01 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by:

Templus is a carrier-neutral regional colocation platform launched in Spain in 2024 by Teras Capital, with backing from ICG. It runs 17 data centres in eight countries with more than 65 MW, including nine bought from AtlasEdge and three bought from Grupo Aire in 2026.

In Spain it operates MAD01 in Alcalá de Henares, MAD02 and MAD03 in Madrid, BCN01 and BCN02 on a joint L'Hospitalet campus, MAL01 in Málaga, SEV01 in Seville and VAL01 in Paterna, and is building CEU01 in the port of Ceuta. Its headquarters are in Alcalá de Henares.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Spain Approves Data Center Decree Requiring 80 Percent Renewable Power
Spain's Council of Ministers approved a royal decree on Nov. 20 that ties large data centers' grid access to renewable energy use. [Royal Decree 1032/2026](https://www.boe.es/diario_boe/txt.php?id=...

Spain Approves Data Center Decree Requiring 80 Percent Renewable Power

November 23, 2026 Spain

Spain's Council of Ministers approved a royal decree on Nov. 20 that ties large data centers' grid access to renewable energy use. Royal Decree 1032/2026 was published in the Official State Gazette on Nov. 21 and entered into force on Nov. 22. The approval follows Baxtel's October...

Read more
Read Merlin Pauses Two Bilbao Data Center Buildings, Cuts MEGA Plan to 704MW
[Merlin Properties](https://baxtel.com/data-centers/merlin-properties) has paused work on two buildings at its [Bilbao-Arasur data center campus](https://baxtel.com/data-center/merlin-bilbao-arasur...

Merlin Pauses Two Bilbao Data Center Buildings, Cuts MEGA Plan to 704MW

November 19, 2026 Merlin Properties

Merlin Properties has paused work on two buildings at its Bilbao-Arasur data center campus after failing to secure an electricity supply for them. The suspension covers Arasur 4 and Arasur 5 in Álava, in Spain's Basque Country. Chief executive Ismael Clemente confirmed the halt at...

Read more
Read Spain Raises Data Center Threshold to 10MW in Revised Renewables Decree
[Spain](https://baxtel.com/regions/spain) has raised the threshold at which its draft data center rules apply to 10MW from 1MW. The Ministry for Ecological Transition and the Demographic Challenge ...

Spain Raises Data Center Threshold to 10MW in Revised Renewables Decree

October 27, 2026 Spain

Spain has raised the threshold at which its draft data center rules apply to 10MW from 1MW. The Ministry for Ecological Transition and the Demographic Challenge sent the revised decree to the Council of State on October 26, Reuters reported. The text replaces an August draft that covered...

Read more
Read Spain Proposes Rules Requiring Data Centers To Source 80% Of Power From New Renewables
Spain is preparing legislation that would require data centers of 1MW or more to source at least 80% of their electricity from new renewable generation on an hourly basis. The draft rules, approved...

Spain Proposes Rules Requiring Data Centers To Source 80% Of Power From New Renewables

August 26, 2026 Spain

Spain is preparing legislation that would require data centers of 1MW or more to source at least 80% of their electricity from new renewable generation on an hourly basis. The draft rules, approved for fast-track legislation, would apply only to new data centers and undergo public consultation...

Read more
Read Solaria Launches European Data Center Platform
Solaria Launches European Data Center Platform

Solaria Launches European Data Center Platform

November 25, 2025 Spain

Spanish energy firm Solaria Energia has formally launched its European sustainable data center platform. The platform includes approximately 3.4GW of secured grid power across 400 hectares (990 acres) spanning Spain, Italy, Germany, and the UK. In addition, the company has reportedly requested...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.